Worksite Traffic Management Planning and Safety
28 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary benefit of a carefully planned and well-laid-out worksite?

  • Decreasing the potential for accidents to happen (correct)
  • Reducing the cost of equipment and personnel
  • Increasing the number of workers on site
  • Enhancing the aesthetic appeal of the worksite

What is the outcome of correct equipment, personnel, and safety considerations?

  • Higher maintenance costs
  • Increased property losses
  • Lower incidence of injuries and fatalities (correct)
  • Lower productivity

What is the result of increased awareness among workers about worksite safety?

  • Improved safety performance (correct)
  • Higher risk of accidents
  • Reduced worker morale
  • Less attention to safety protocols

What is the key element of good worksite traffic management?

<p>Careful planning (D)</p> Signup and view all the answers

What is the benefit of a well-planned worksite in terms of productivity?

<p>Higher productivity (D)</p> Signup and view all the answers

What is the primary purpose of signs in the Advanced Warning Area?

<p>To provide warning, guidance, or instruction to road users (D)</p> Signup and view all the answers

What is the distance, in meters, where the first advanced warning sign is typically located before the start of the taper?

<p>2D meters (B)</p> Signup and view all the answers

What is the purpose of the 'ROADWORKS AHEAD' sign?

<p>To provide the first warning to road users of the upcoming work zone (A)</p> Signup and view all the answers

What is the consideration that should be given when applying the principles of worksite traffic management?

<p>Road alignment, visibility, traffic speeds, etc. (A)</p> Signup and view all the answers

What is the purpose of lane tapers using cones, bollards or temporary hazard markers?

<p>To guide traffic into the work zone at a reduced speed (C)</p> Signup and view all the answers

What is the term 'D' used to represent in a Temporary Traffic Control Zone?

<p>The approach speed of traffic in kilometers per hour (B)</p> Signup and view all the answers

What is the primary reason for reviewing the layout of signs periodically?

<p>To ensure that signs are still in place and still appropriate (D)</p> Signup and view all the answers

What is the correct sequence for removing signs from the worksite?

<p>Driving instruction signs, other warning signs, advance warning signs (C)</p> Signup and view all the answers

Who is responsible for ensuring the road is clean and ready for traffic after completion of the works?

<p>The contractor (C)</p> Signup and view all the answers

Why is it important to document roadwork signs and their positions?

<p>To provide evidence in case of traffic accidents or legal requests (B)</p> Signup and view all the answers

What is the primary purpose of the sign No. G9-40-2?

<p>To indicate that a detour has ended (A)</p> Signup and view all the answers

What should be removed from the worksite and approaches to the site upon completion of the works?

<p>All signs and temporary structures (D)</p> Signup and view all the answers

What is the characteristic of the sign No. T3-12?

<p>It has a yellow reflectorized background with black letters (D)</p> Signup and view all the answers

What is the size of the sign No. T2-23?

<p>1200 x 600 mm (C)</p> Signup and view all the answers

How often should the documentation of roadwork signs and their positions be updated?

<p>Regularly, as needed (D)</p> Signup and view all the answers

What is the purpose of the sign No. T1-10?

<p>To warn of a non-specific traffic hazard ahead (A)</p> Signup and view all the answers

What is the background color of the sign No. T5-6A?

<p>Black (A)</p> Signup and view all the answers

What is the primary objective of planning in roadwork site traffic management?

<p>To minimize disruption to traffic and ensure a safe environment (D)</p> Signup and view all the answers

What is the primary benefit of a carefully planned worksite traffic management?

<p>Decreased potential for accidents (C)</p> Signup and view all the answers

How many elements are involved in roadwork site traffic management?

<p>8 (C)</p> Signup and view all the answers

What is one of the key objectives of planning in roadwork site traffic management?

<p>To keep the progress of the roadworks (C)</p> Signup and view all the answers

What is an essential element of roadwork site traffic management?

<p>Management of vehicular and pedestrian traffic (B)</p> Signup and view all the answers

What is the ultimate goal of roadwork site traffic management?

<p>To provide a safe environment for workers and road users (D)</p> Signup and view all the answers

More Like This

Traffic Management Quiz
3 questions

Traffic Management Quiz

GentlestSavannah2467 avatar
GentlestSavannah2467
Construction Roadworks Overview
8 questions

Construction Roadworks Overview

WorthExtraterrestrial4150 avatar
WorthExtraterrestrial4150
Use Quizgecko on...
Browser
Browser