Workshop Material Handling and Tool Calibration Quiz

RedeemingGeranium avatar
RedeemingGeranium
·
·
Download

Start Quiz

Study Flashcards

18 Questions

Which type of diagram is a schematic diagram?

A diagram that shows the functional relationship between components

What is the color of a dry powder fire extinguisher and for which fire class is it suitable?

Red color, suitable for fire class B and C

After a heavy landing, which engine component should be checked?

Engine compressor shaft alignment

Which type of fire extinguisher can be used in the aircraft cabin?

B.C.F. (Bromochlorodifluoromethane) or water extinguisher

How should precision instruments be stored and handled?

With great care, both in storage and in use, and kept in special boxes

When comparing the machining techniques for stainless steel sheet material to those for aluminum alloy sheet, it is normally considered good practice to drill the stainless steel at a:

Lower speed with less pressure applied to the drill

Which of the following is the most correct reason to have firm control over the handling of materials used in workshops?

Safety, management, and economy

The purpose of having a sticker attached to a tool that details the date of the next calibration is to:

Indicate that the tool should not be used if it is out of calibration

When using a 'GO / NO-GO' gauge, which of the following is being checked?

Tolerance

When disassembling or removing a component from an aircraft, which of the following is the most important action to take with small items like bolts, screws, nuts, washers, and shims?

Identify them by part number, location, and aircraft

To ensure protection against HIRF (High-Intensity Radiated Fields) affecting audio and navigation aids, which of the following actions is most important?

All of the above

What is the recommended action to take with a common circlip that has been removed from a component?

Carefully clean and inspect the circlip before reinstalling it

What is the primary purpose of grounding an aircraft?

To prevent the development of radio frequency potentials

If an insulation test on a group of cables yields a low reading, what should be done?

Break down the circuit and conduct further checks

When should a Certificate of Release to Service be issued?

After a repair has been carried out according to an approved scheme

Following a reported heavy or overweight landing, what must be inspected?

Both the primary and secondary structures

Where should a chain be disconnected during maintenance?

At a spring clip joint

If a control chain can be lifted clear of a tooth, what action should be taken?

Remove the chain and perform an elongation check

Test your knowledge on safety control in handling workshop materials and the importance of tool calibration. Questions cover topics like management, economy, calibration programs and disposal of unused materials.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Primary Processing Product Handling
0 questions
Workshop Practices Quiz
10 questions

Workshop Practices Quiz

SociableSpessartine avatar
SociableSpessartine
situation
4 questions

situation

FluentAmetrine7832 avatar
FluentAmetrine7832
Use Quizgecko on...
Browser
Browser