Work Study and Industrial Engineering
22 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is one of the primary objectives of work study?

  • Increasing workforce size
  • Enhancing employee benefits
  • Measuring performance for better standardization (correct)
  • Establishing maximum costs for production
  • Which technique is NOT associated with work study?

  • Quality assurance (correct)
  • Work measurement
  • Operational analysis
  • Method study
  • How does work study contribute to improved productivity?

  • By standardizing work methods (correct)
  • By increasing overtime for workers
  • By fostering competition among workers
  • By minimizing employee training time
  • What is a benefit of using work study methods?

    <p>Decreased cost of production</p> Signup and view all the answers

    Which factor is emphasized by industrial engineering in relation to work study?

    <p>Design and enhancement of engineering systems</p> Signup and view all the answers

    What does the term 'work hour' specifically refer to in work study?

    <p>The labour of one person for one hour</p> Signup and view all the answers

    Which of the following is a common misconception regarding work study?

    <p>It is solely focused on reducing costs.</p> Signup and view all the answers

    Which of the following outcomes is directly associated with the advantages of work study?

    <p>Increased safety and efficiency</p> Signup and view all the answers

    What does basic work content represent?

    <p>The irreducible minimum time theoretically required to produce one unit of output.</p> Signup and view all the answers

    Which of the following best describes the nature of work study?

    <p>It is a means to increase productivity through the reorganization of work.</p> Signup and view all the answers

    What is the primary focus of method study?

    <p>To systematically examine and improve the ways tasks are performed.</p> Signup and view all the answers

    How is work measurement primarily concerned?

    <p>Investigating ineffective time linked to a job.</p> Signup and view all the answers

    Which of the following is NOT one of the eight steps in performing a complete work study?

    <p>Define the objectives of the study.</p> Signup and view all the answers

    What is one benefit of properly applied work study?

    <p>It exposes weaknesses in all organizational functions.</p> Signup and view all the answers

    What is a key objective of method study?

    <p>To find methods for increasing production and reducing costs.</p> Signup and view all the answers

    During the critical examination step of work study, which factor is NOT typically considered?

    <p>The financial investment in machinery.</p> Signup and view all the answers

    Which statement accurately reflects the relationship between method study and work measurement?

    <p>They are closely linked, with method study focusing on process improvement and work measurement on time assessment.</p> Signup and view all the answers

    What should be done after developing a new economic method in a work study?

    <p>Evaluate the new method against the original practice.</p> Signup and view all the answers

    After installing a new method, what is the subsequent step in work study?

    <p>Maintain the new standard practice.</p> Signup and view all the answers

    Why should work study be handled with care and skill?

    <p>To avoid creating animosity among employees and management.</p> Signup and view all the answers

    What is one advantage of using method study across different sectors?

    <p>It can be applied successfully in various types of work environments.</p> Signup and view all the answers

    Which of the following best describes the results of a properly applied work study?

    <p>Savings start immediately and persist with improved operations.</p> Signup and view all the answers

    Study Notes

    Work Study and Industrial Engineering

    • Work study and industrial engineering are crucial for improving organizational efficiency and productivity in competitive environments.
    • They help simplify, design, and enrich jobs, conduct value analysis/engineering, and analyze methods and operations.
    • Industrial engineering optimizes systems involving plants, machinery, and workers.

    Work Study Techniques

    • Work study uses method study and work measurement to assess human work potential (time taken for tasks) and find ways to increase productivity and efficiency.
    • It aims to improve on-the-job performance, optimize plant/machinery use, and standardize work methods.
    • Key objectives include scientifically analyzing existing methods, measuring worker performance, optimizing resource use, boosting productivity and worker morale, and enhancing organizational efficiency.

    Advantages of Work Study

    • Increases production efficiency and utilizes resources optimally.
    • Improves material and product flow, handling, and layout.
    • Decreases production costs by reducing time spent on tasks.
    • Boosts worker morale, safety, and efficiency.
    • Establishes benchmark and standard performance levels.
    • Enhances job satisfaction and incentivizes workers.

    Defining Work & Machine Hours

    • A work hour represents one person working for one hour.
    • A machine hour represents one machine running for one hour.

    Basic Work Content

    • Basic work content is the minimum time theoretically required to produce one unit of output, assuming perfect design, process, and no wasted time (except for legitimate breaks).
    • This is an idealized concept, rarely achieved in practice.

    Work Study Approach

    • It's a systematic and accurate method for setting performance standards, crucial for production planning and control.
    • It identifies both good and bad operational functioning of a company.
    • It is necessary to proceed with tact to avoid negative reactions from workers and management.
    • Work study potentially exposes inefficiency to motivate change.

    Nature of Work Study

    • Improves plant productivity through work reorganization, requiring minimal capital investment.
    • It is systematic, ensuring no efficiency factors are missed.
    • It is the most precise method for establishing performance standards.
    • Contributes to workplace safety and improved working conditions.
    • Savings from improved work study methods are immediate and sustained.
    • It is a versatile tool applicable across various industries (manufacturing, offices, stores, laboratories, service industries, farms).
    • It is a relatively inexpensive and easy-to-implement method.
    • Identifies broader organizational inefficiencies.

    Method Study and Work Measurement

    • Method study systematically improves existing work methods.
    • Work measurement establishes time standards for completing a task at a defined performance level.
    • Method study reduces work content; work measurement identifies and eliminates ineffective time.
    • Method study enhances efficiency and profitability.

    Basic Procedure of Work Study

    • Step 1: Select the job or process to be studied.
    • Step 2: Collect, record relevant job/process data using appropriate techniques.
    • Step 3: Critically analyze recorded data, considering purpose, location, sequence, person, and methods.
    • Step 4: Develop the most cost-effective method.
    • Step 5: Evaluate the improved method and calculate a standard time.
    • Step 6: Present the improved method and standard time to all stakeholders.
    • Step7: Implement the new method and provide training.
    • Step 8: Continuously monitor and compare results against original targets to maintain the standard practice.

    Method Study Objectives

    • Study existing and proposed work processes.
    • Identify new methods for increased production and cost reduction.
    • Achieve optimum resource utilization.
    • Enhance organizational productivity and profitability.

    Method Study Procedures

    • Step 1: Select the work to be studied.
    • Step 2: Record the current method.
    • Step 3: Critically examine the recorded facts.
    • Step 4: Develop the most practical, economical, and effective method.
    • Step 5: Implement the new method.
    • Step 6: Maintain and check the new method.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Explore the fundamentals of work study and industrial engineering, focusing on their roles in enhancing organizational efficiency and productivity. This quiz covers key techniques, advantages, and objectives of work study, including methods for optimizing workflows and measuring performance. Test your knowledge and understanding of these essential engineering concepts.

    More Like This

    Use Quizgecko on...
    Browser
    Browser