Veeam Recovery Orchestrator and DataLabs Quiz
12 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the purpose of testing a Replica plan in a DataLab?

  • To simulate a production environment
  • To configure test scheduling
  • To ensure it is successful without errors (correct)
  • To interrupt plan execution

What is the function of Virtual Labs and DataLabs in testing orchestration plans?

  • To schedule plan execution
  • To reset the plan state
  • To configure readiness checks
  • To test the recovery of virtual machines inside an isolated bubble (correct)

What action indicates that a plan is ready for restoration?

  • Clearing the current plan state
  • Scheduling a time for plan execution
  • Interrupting plan execution
  • Successful readiness check and DataLab test (correct)

When can a replica plan be run?

<p>At any time (D)</p> Signup and view all the answers

What is the first step in the failover process?

<p>Shutting down the source VM (B)</p> Signup and view all the answers

What is the purpose of the Permanent Failover procedure?

<p>To delete restore point snapshots and remove source VMs from replication jobs (C)</p> Signup and view all the answers

When would you choose the Permanent Failover (to DR) option?

<p>When the Production site has been destroyed (C)</p> Signup and view all the answers

What are the options after the failover is complete?

<p>Commit the changes (C)</p> Signup and view all the answers

What does the Undo Failover procedure involve?

<p>Discarding changes made to the replicas and shutting down the replicas (A)</p> Signup and view all the answers

What is the purpose of the Failback (to Production) option?

<p>To replicate the changes back to the Production VMs and test the changes (C)</p> Signup and view all the answers

What is the recommended action after failing over to the replica VMs in the DR site?

<p>Undo Failover (C)</p> Signup and view all the answers

What is the final step in the Permanent Failover Procedure?

<p>Use the latest Restore Point (A)</p> Signup and view all the answers

More Like This

Use Quizgecko on...
Browser
Browser