Which version of the URD Design & Construction Standard was released on 27 June 2022?

  • Version 3 (correct)
  • Version 4
  • Version 1
  • Version 2

What was the purpose of Version 2 of the URD Design & Construction Standard?

  • To introduce new construction techniques
  • To update major design requirements
  • To correct grammatical and typographical errors (correct)
  • To change the maximum offset for service pits

What change was made to the service pit maximum offset in Version 3 of the URD Design & Construction Standard?

  • It was increased from 300mm to 400mm (correct)
  • It was decreased from 300mm to 200mm
  • It was increased from 200mm to 250mm
  • It was decreased from 400mm to 300mm

What change was made to the concrete collar depth for service pit installation in footpath or driveway in Version 3 of the URD Design & Construction Standard?

<p>It was decreased from 250mm to 200mm (A)</p> Signup and view all the answers

Which companies hold the copyright for the URD Design & Construction Standard?

<p>CitiPower, Jemena Electricity Networks, Powercor Australia, AusNet Services, and United Energy (A)</p> Signup and view all the answers

Which organizations hold the copyright for the URD Design & Construction Standard?

<p>CitiPower, Jemena Electricity Networks, Powercor Australia, AusNet Services and United Energy (B)</p> Signup and view all the answers

What was the release date of Version 1 of the URD Design & Construction Standard?

<p>01 May 2021 (D)</p> Signup and view all the answers

What was the purpose of Version 2 of the URD Design & Construction Standard?

<p>To update minor grammatical and typographical errors (C)</p> Signup and view all the answers

What is the concrete collar depth for service pit installation in footpath or driveway in Version 3 of the URD Design & Construction Standard?

<p>200mm (A)</p> Signup and view all the answers

What change was made to the service pit maximum offset in Version 3 of the URD Design & Construction Standard?

<p>Changed from 300mm to 400mm (C)</p> Signup and view all the answers