Questions and Answers
What is the total track length in TSM?
What is the total track length in TSM?
- 80.256 TKM
- 76.131 TKM (correct)
- 70.500 TKM
- 75.000 TKM
How many operational tracks are there at the pre-tippler area for receiving and dispatching rakes?
How many operational tracks are there at the pre-tippler area for receiving and dispatching rakes?
- 30
- 15
- 25
- 20 (correct)
Which of the following components is part of the track components listed?
Which of the following components is part of the track components listed?
- Signal lamp
- Sleeper (correct)
- Brake shoe
- Coupling rod
What is considered a trailing movement in rail operations?
What is considered a trailing movement in rail operations?
How many owned locomotives (Diesel electric) are there?
How many owned locomotives (Diesel electric) are there?
Which area has the fewest operational track lines according to the provided information?
Which area has the fewest operational track lines according to the provided information?
What is the number of track lines at the HSM yard for loading HR coil?
What is the number of track lines at the HSM yard for loading HR coil?
How many hired locomotives (Titan) are there?
How many hired locomotives (Titan) are there?
What is the first step in the detachment of railway power?
What is the first step in the detachment of railway power?
Which activity must be performed after the completion of rake unloading?
Which activity must be performed after the completion of rake unloading?
What should be done if a deficiency is found during the empty rake formation?
What should be done if a deficiency is found during the empty rake formation?
What is the purpose of informing the commercial staff after TSM loco is attached?
What is the purpose of informing the commercial staff after TSM loco is attached?
What is the maximum carrying capacity weight for the BRN wagon?
What is the maximum carrying capacity weight for the BRN wagon?
What is necessary to wear during the detachment process for safety?
What is necessary to wear during the detachment process for safety?
Which wagon has the highest maximum carrying capacity weight for slag loading?
Which wagon has the highest maximum carrying capacity weight for slag loading?
What is the maximum carrying capacity weight of the BTPN wagon used in coal tar loading?
What is the maximum carrying capacity weight of the BTPN wagon used in coal tar loading?
Which of the following wagons is used for iron ore and fluxes loading with a maximum carrying capacity weight of 65 T?
Which of the following wagons is used for iron ore and fluxes loading with a maximum carrying capacity weight of 65 T?
How many operational track lines are there at the pre-tippler area for rake movement?
How many operational track lines are there at the pre-tippler area for rake movement?
What is the maximum carrying capacity weight of the BOXN wagon used in coal loading?
What is the maximum carrying capacity weight of the BOXN wagon used in coal loading?
What type of track is laid for rolling stock movement from MRDL/BDPK till HSM/CRM inside TSM?
What type of track is laid for rolling stock movement from MRDL/BDPK till HSM/CRM inside TSM?
Which wagon has the maximum carrying capacity of 79 T?
Which wagon has the maximum carrying capacity of 79 T?
What is the average monthly dispatch of steel?
What is the average monthly dispatch of steel?
Which of the following materials is dispatched the least amount per month?
Which of the following materials is dispatched the least amount per month?
What type of slag is mentioned as a material in the dispatch list?
What type of slag is mentioned as a material in the dispatch list?
How many total level crossings are mentioned in the document?
How many total level crossings are mentioned in the document?
Which process step follows the arrival of the rake?
Which process step follows the arrival of the rake?
Which unloading point is NOT listed in the inward rakes unloading points?
Which unloading point is NOT listed in the inward rakes unloading points?
What type of coal is mentioned among the materials?
What type of coal is mentioned among the materials?
Which section of rail transport is described for placement at unloading stations?
Which section of rail transport is described for placement at unloading stations?
What is the term used for the movement of rolling stock when it first travels the switching section of a point?
What is the term used for the movement of rolling stock when it first travels the switching section of a point?
What percentage of incoming raw material is transported by rail according to the rail coefficients?
What percentage of incoming raw material is transported by rail according to the rail coefficients?
Which of the following commodities has the highest percentage transported by rail?
Which of the following commodities has the highest percentage transported by rail?
Which mine mentioned is associated with the lifting through rail and road?
Which mine mentioned is associated with the lifting through rail and road?
What is the rail coefficient for slag transportation?
What is the rail coefficient for slag transportation?
What type of loading permission is needed for rail lift at Joda?
What type of loading permission is needed for rail lift at Joda?
Which location is associated with lifting only through rail?
Which location is associated with lifting only through rail?
Which of these materials has a higher road coefficient than rail for transportation?
Which of these materials has a higher road coefficient than rail for transportation?
Study Notes
Wagon Types
- Slag Loading:
- BOXN max CC Wt: 68T
- BOXNHL / BOXNHL25T max CC Wt: 70T / 78.4T
- BOBRN max CC Wt: 65T
- BOXNS max CC Wt: 79T
- Coal Tar Loading:
- BTPN max CC Wt: 54.9T
- Coal Loading:
- BOXN max CC Wt: 66T
- BOBYN max CC Wt: 62T
- BOBRN max CC Wt: 65T
- BOBSN max CC Wt: 60.8T
- Iron Ore & Fluxes Loading:
- BOXN max CC Wt: 66T
- BOBRN max CC Wt: 65T
- HRC & Sponge Iron Loading:
- Container Train
- Flat Bed Rake for Container Loading
Tata Steel Track Details
- Total track length: 76.131 TKM
- Track length from MRDL till Railway gate: 7.318 TKM
- Track length from BDPK till Railway gate: 5.231 TKM
- Track length from Rail gate till wagon tipplers: 25.248 TKM
- Post tippler yard: 16.464 TKM
- Slag yard to HSM: 8.803 TKM
- Track length in hot metal area: 10.037 TKM
Rail Facility Operational Details
- Pre-tippler area: 20 operational track lines
- Post-tippler area: 15 operational track lines
- Hot metal area: 3 operational track lines
- HSM yard: 6 track lines for HR coil loading
- CRM yard: 3 track lines for CR coil loading
- Slag yard: 2 track lines for G. slag loading
- SMS1: 2 track lines for loading coal tar and container rake
- Total points: 183 (168 motorized, 15 hand operated)
- Locomotives: 11 owned (diesel electric), 2 hired (Titan)
- TLC (Torpedo ladle car): 18
Track Components
- Heel Block
- Stock Rail
- Switch Rail
- Stretcher Bar
- Ballast
- Drive Rod
- Sleeper
- Pandrol Clip
Facing and Trailing Movement
- Trailing Movement: Rolling stock travels the crossing section of a point for the first time.
- Facing Movement: Rolling stock travels the switching section of a point for the first time.
Raw Material Handling
- Approximate materials received per month: 16 lac MT
- Incoming Material Rail Coefficient: 60%
- Incoming Material Road Coefficient: 40%
- Finished Goods (including slab) Rail Coefficient: 77.3%
- Finished Goods (including slab) Road Coefficient: 22.7%
- Slag Rail Coefficient: 72.6%
- Slag Road Coefficient: 27.4%
- DRI Rail Coefficient: 83.10%
- DRI Road Coefficient: 16.90%
- Coal Tar Rail Coefficient: 71.08%
- Coal Tar Road Coefficient: 28.92%
OMQ (Tata Steel Ltd) Mines & Lifting
- Ore Mines Quarry (OMQ)
- Khandabo: Lifting thru RAIL & ROAD - JRLI, BSPX, NYG
- Joda: Lifting thru RAIL - JMTC (Mechanized Loading)
- Noamund: Lifting thru RAIL - MTRN (Mechanized Loading)
- Katamati: Lifting thru RAIL - DJHR (Mechanized Loading)
- Permission:
- JDM, JODA (Khandabo & Joda)
- CHAIBASA, JHARKHAND (Noamund)
- Coal & Fluxes
- West Bokaro: Lifting thru RAIL - WBCC
- Paradeep: Lifting thru RAIL (Mechanized Loading)
- Dhamra: Lifting thru ROAD
- MCL: Lifting thru RAIL
Outward Rakes Loading Details
- HSM
- HR coil
- Cobble plate
- HR Sheet
- HR Slab
- Baby Coil
- Scrap
- CRM
- CR Coil
- CR Sheet
- GP Coil
- GP Sheet
- SMS1
- Coal tar
- DRI materials (Direct reduced iron)
- Slag Yard
- G Slag
- Fly Ash
Materials Dispatch
- Average Monthly Dispatch:
- Steel: 4 lac MT
- Slag: 1.5 lac MT
- DRI: 30 thousand MT
- Coal tar: 2,400 MT
Inward Rakes Unloading Points
- Wagon Tipper
- Track Hopper (TH1, TH2)
- Manual Siding (T1, T2, T3, T4)
Railway Level Crossing Gates in TSM
- Total: 24 level crossings
Process for Inward Rake Placement
- Raw Material Rake Admittance:
- Arrival of rake and railway power detachment
- Pressure release
- Decoupling of hose pipe
- TSM loco attachment
- Placement at unloading stations as per RMHS team planning
- Railway Power Detachment:
- Close air pressure valve on engine and wagon sides
- Detach brake pipe from wagon and engine
- Lift CBC handle
- Empty Rake Formation:
- Inspect empty wagons for door openings or decoupling
- Report any deficiencies to RMHS
- Attach TSM loco for rake formation
- Draw rake to designated track line
- Inform commercial staff for release
- Confirm with railway commercial
- Inform station to program railway power
- Conduct EOT and train checking
- Exit siding safely
Outward Load Rakes Activities
- After loading completion, inform commercial staff for rake release
- Inform MRDL station for program railway power
- Conduct EOT and train checking
- Exit siding safely
Presenter Information
- Name: Priyendu N Giri
- Contact: 7077762551
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz covers various types of wagons used for different loading purposes, including slag, coal, and iron ore. Additionally, it provides details about the operational track lengths at Tata Steel facilities, helping to understand the logistics involved in rail transport. Test your knowledge on these important topics!