Ch 9 pg 258-261
21 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Trench cuts should only be used as a _____ tactic

Defensive

The word trench implies a ___ opening is crucial to its effectiveness

Deep

You must cut a _____ vent hole prior to the trench cut

Main

The exception to cutting the main vent hole first is in larger departments where ___ or more saws are immediately available

<p>4</p> Signup and view all the answers

Cut your trench 20-__ ft away from the main vent hole

<p>25</p> Signup and view all the answers

Make the cut at the narrowest point usually called the ____

<p>Throat</p> Signup and view all the answers

Personnel may find ____ walls usually at the wall between two apartments

<p>Party</p> Signup and view all the answers

Estimate the most likely ___ and the area of greatest ___ that can be protected and use the trench and hoselines at that point

<p>Path value</p> Signup and view all the answers

The ____ of the roof may come into play with direction of fire travel if there is little to no wind

<p>Pitch</p> Signup and view all the answers

Inspection holes should be made _ or _ ft in front of the intended edge of the trench

<p>5 6</p> Signup and view all the answers

Make two parallel cuts about _ ft apart from outer wall to outer wall of the building. Note the trench shouldn’t be made any narrower than _ ft or fire may jump past it

<p>3 3</p> Signup and view all the answers

Next cut the trench into __ or __ ft long sections starting as close as possible to the outer walls and working your way to the center

<p>3 4</p> Signup and view all the answers

Make knockouts on the ____ side where tools can grab the roofing.

<p>Fire</p> Signup and view all the answers

All personnel on the fireside must have at least ___ ways of the roof not counting crossing the trench

<p>Two</p> Signup and view all the answers

___ or ___ hoselines should be placed on the top floor on the safe side of the trench

<p>One two</p> Signup and view all the answers

Allow one ___ in hoseline per room below the trench and ___ for every 15 to 20ft of trench on the roof

<p>1 3/4 1</p> Signup and view all the answers

These lines should be committed ___ and separate from the attack lines

<p>Early</p> Signup and view all the answers

The FFs must have patience to wait until fire shows at the _____ holes on the fire side of the trench

<p>Examination</p> Signup and view all the answers

It is perfectly acceptable to use hoses from with below or from the ___ to drive fire away from the trench

<p>Roof</p> Signup and view all the answers

structures other than __ types may be very long, relatively narrow ____ type apartment complexes

<p>H garden</p> Signup and view all the answers

A 75ft deep store would need two 75 ft long parallel cuts and 20 to __ 3ft long crosscuts to subdivide the trench into manageable pieces , for a total of more than ___ linear ft of cutting

<p>25 225</p> Signup and view all the answers

More Like This

WWI Trench Warfare Flashcards
26 questions

WWI Trench Warfare Flashcards

WellRegardedObsidian1129 avatar
WellRegardedObsidian1129
EOG 300 pg 109-110 Trench Rescue Operations
15 questions
Ch9 pg 257-261
50 questions

Ch9 pg 257-261

HeavenlyAntimony5079 avatar
HeavenlyAntimony5079
Use Quizgecko on...
Browser
Browser