Podcast
Questions and Answers
Which of the following is NOT a course objective of the BRSK KM Dubai Metro Training Course?
Which of the following is NOT a course objective of the BRSK KM Dubai Metro Training Course?
- Provide basic information on train serial number and train run number
- Identify and locate Dubai metro exterior equipment (correct)
- Understand the functionality power supply system and 3rd rail system in Dubai Metro
- Identify Hazards and apply mitigation measures
What is the aim of the BRSK KM Dubai Metro Training Course?
What is the aim of the BRSK KM Dubai Metro Training Course?
- To differentiate the functionality of ATC signaling system
- To become fully aware of the safety requirements for train operation
- To provide candidates with the underpinning knowledge, skills, and techniques required to perform their duty as a train driver (correct)
- To identify and locate Dubai metro exterior equipment
What does ATC stand for in the context of the Dubai Metro?
What does ATC stand for in the context of the Dubai Metro?
- Automatic Train Control (correct)
- Advanced Track Control
- Advanced Train Control
- Automatic Track Control
Which of the following is NOT a location that candidates are required to identify and locate during the training?
Which of the following is NOT a location that candidates are required to identify and locate during the training?
What is the main focus of the BRSK KM Dubai Metro Training Course?
What is the main focus of the BRSK KM Dubai Metro Training Course?