Train Safety and Hazard Identification Quiz
5 Questions
2 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which of the following is NOT a course objective of the BRSK KM Dubai Metro Training Course?

  • Provide basic information on train serial number and train run number
  • Identify and locate Dubai metro exterior equipment (correct)
  • Understand the functionality power supply system and 3rd rail system in Dubai Metro
  • Identify Hazards and apply mitigation measures
  • What is the aim of the BRSK KM Dubai Metro Training Course?

  • To differentiate the functionality of ATC signaling system
  • To become fully aware of the safety requirements for train operation
  • To provide candidates with the underpinning knowledge, skills, and techniques required to perform their duty as a train driver (correct)
  • To identify and locate Dubai metro exterior equipment
  • What does ATC stand for in the context of the Dubai Metro?

  • Automatic Train Control (correct)
  • Advanced Track Control
  • Advanced Train Control
  • Automatic Track Control
  • Which of the following is NOT a location that candidates are required to identify and locate during the training?

    <p>Dubai metro interior equipment</p> Signup and view all the answers

    What is the main focus of the BRSK KM Dubai Metro Training Course?

    <p>Becoming fully aware of the safety requirements for train operation</p> Signup and view all the answers

    Use Quizgecko on...
    Browser
    Browser