Which step should be taken after installing the four pressure plates?
Which step should be taken after installing the four pressure plates?
- Shake one bubble press cam toward the center (correct)
- Loosen the screw of the bubble press cams
- Install the bottom mold without locking it
- Disconnect the air supply
Where should the height adjustment for the blank box be done?
Where should the height adjustment for the blank box be done?
- On the side of the machine
- On the back of the machine
- On the top of the machine
- On the bottom of the machine (correct)
What should be done before installing the upper mold?
What should be done before installing the upper mold?
- Press the bottom cylinder mold
- Shake the foam pressing mold
- Loosen the screw of the bubble press cams
- Disconnect the air supply (correct)
What should be done to ensure enough space to install the upper mold?
What should be done to ensure enough space to install the upper mold?
What should be done to align and tighten the upper mold?