Questions and Answers

Which step should be taken after installing the four pressure plates?

  • Shake one bubble press cam toward the center (correct)
  • Loosen the screw of the bubble press cams
  • Install the bottom mold without locking it
  • Disconnect the air supply

Where should the height adjustment for the blank box be done?

  • On the side of the machine
  • On the back of the machine
  • On the top of the machine
  • On the bottom of the machine (correct)

What should be done before installing the upper mold?

  • Press the bottom cylinder mold
  • Shake the foam pressing mold
  • Loosen the screw of the bubble press cams
  • Disconnect the air supply (correct)

What should be done to ensure enough space to install the upper mold?

<p>Shake the foam pressing mold to move outward (A)</p> Signup and view all the answers

What should be done to align and tighten the upper mold?

<p>Adjust the upper mold, align the center, and evenly gap around (D)</p> Signup and view all the answers

Flashcards are hidden until you start studying

More Like This

Hardness Testing Methods Quiz
6 questions
CNC Programming Standards Quiz
24 questions
Rapid Tooling (RT) in Manufacturing
20 questions
Use Quizgecko on...
Browser
Browser