Tooling Setup
5 Questions
0 Views

Tooling Setup

Created by
@PleasurableUnity

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which step should be taken after installing the four pressure plates?

  • Shake one bubble press cam toward the center (correct)
  • Loosen the screw of the bubble press cams
  • Install the bottom mold without locking it
  • Disconnect the air supply
  • Where should the height adjustment for the blank box be done?

  • On the side of the machine
  • On the back of the machine
  • On the top of the machine
  • On the bottom of the machine (correct)
  • What should be done before installing the upper mold?

  • Press the bottom cylinder mold
  • Shake the foam pressing mold
  • Loosen the screw of the bubble press cams
  • Disconnect the air supply (correct)
  • What should be done to ensure enough space to install the upper mold?

    <p>Shake the foam pressing mold to move outward</p> Signup and view all the answers

    What should be done to align and tighten the upper mold?

    <p>Adjust the upper mold, align the center, and evenly gap around</p> Signup and view all the answers

    More Like This

    Use Quizgecko on...
    Browser
    Browser