Podcast
Questions and Answers
What is the total cost of the timber framing needed for the garden construction, including GST?
What is the total cost of the timber framing needed for the garden construction, including GST?
The total cost of the timber framing needed for the garden construction, including GST, is $120.75.
What is the volume of the water tank in the centre of the garden?
What is the volume of the water tank in the centre of the garden?
The volume of the water tank in the centre of the garden is approximately 8,267.97 cubic centimetres.
How much compost will be needed to fill the garden up to the top edge?
How much compost will be needed to fill the garden up to the top edge?
The amount of compost needed to fill the garden up to the top edge is dependent on the size of the garden, which is not provided in the given information.
Study Notes
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Sure, what is the topic of the quiz?