The Giant Wind Farm Project

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

Which body of water is the wind farm being built in?

  • Atlantic Ocean
  • Baltic Sea
  • North Sea (correct)
  • Mediterranean Sea

How many wind turbines are being erected in the wind farm?

  • 70
  • 80 (correct)
  • 50
  • 100

How long does it take to install a wind turbine?

  • One year
  • One day (correct)
  • One month
  • One week

Where are the towers for the wind turbines waiting to be loaded?

<p>Espjarc (D)</p> Signup and view all the answers

What is the height of the wind turbine towers?

<p>66 meters (A)</p> Signup and view all the answers

More Like This

Use Quizgecko on...
Browser
Browser