During which stage of a project may Pre-occupancy Services Commissioning begin?
During which stage of a project may Pre-occupancy Services Commissioning begin?
- Pre-design stage (correct)
- Post-occupancy stage
- Design stage
- Construction stage
What is the purpose of a logic diagram in the design process?
What is the purpose of a logic diagram in the design process?
- To communicate the design intent to the building constructor
- To review the functional program
- To document the client's expectations
- To identify paths of activity necessary to accomplish goals (correct)
Why should the verification and testing procedures be explained in the bid documents?
Why should the verification and testing procedures be explained in the bid documents?
- To evaluate the time and cost implications of a commissioning agent's participation (correct)
- To review the construction progress
- To ensure the contractor's understanding of the design intent
- To provide guidance to the building operator
Which documents should be included in bid documents prepared with input from the commissioning agent?
Which documents should be included in bid documents prepared with input from the commissioning agent?
What is the purpose of the component verification process?
What is the purpose of the component verification process?
What may be required during systems verification procedures?
What may be required during systems verification procedures?
What should the architect and the commissioning agent consider for integrated system tests that require certain post-occupancy conditions?
What should the architect and the commissioning agent consider for integrated system tests that require certain post-occupancy conditions?