Test Your Knowledge on Pre-occupancy Services Commissioning
7 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

During which stage of a project may Pre-occupancy Services Commissioning begin?

  • Pre-design stage (correct)
  • Post-occupancy stage
  • Design stage
  • Construction stage
  • What is the purpose of a logic diagram in the design process?

  • To communicate the design intent to the building constructor
  • To review the functional program
  • To document the client's expectations
  • To identify paths of activity necessary to accomplish goals (correct)
  • Why should the verification and testing procedures be explained in the bid documents?

  • To evaluate the time and cost implications of a commissioning agent's participation (correct)
  • To review the construction progress
  • To ensure the contractor's understanding of the design intent
  • To provide guidance to the building operator
  • Which documents should be included in bid documents prepared with input from the commissioning agent?

    <p>Commissioning plan, commissioning specifications, specialized documentation related to testing</p> Signup and view all the answers

    What is the purpose of the component verification process?

    <p>To highlight variances in components' service characteristics or operational outputs</p> Signup and view all the answers

    What may be required during systems verification procedures?

    <p>Extra time due to demonstrations of various controls and specialized equipment</p> Signup and view all the answers

    What should the architect and the commissioning agent consider for integrated system tests that require certain post-occupancy conditions?

    <p>Preliminary or conditional testing and recommended acceptance of certain subsystems</p> Signup and view all the answers

    Use Quizgecko on...
    Browser
    Browser