Test Your Knowledge on Battery Safety
6 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

During the startup process, what should you do if leaks occur from the fittings?

  • Increase the pressure control
  • Tighten the leaking fittings
  • Repeat the Setup/Startup process
  • Perform the Pressure Relief Procedure (correct)
  • What should you do after allowing fluid to circulate for 15 seconds during the startup process?

  • Turn the pressure down and turn the prime valve horizontally (correct)
  • Assemble tips and guards
  • Increase the pressure control and turn the pump switch to OFF
  • Disengage the trigger lock and hold all guns against a metal flushing pail
  • What should you do after flushing the system with a flushing fluid pail?

  • Inspect fittings for leaks
  • Place the siphon tube into paint pails
  • Assemble tips and guards (correct)
  • Trigger all guns again into a flushing fluid pail
  • What should you use to press OneSeal into the tip guard during assembly?

    <p>End of the SwitchTip</p> Signup and view all the answers

    What should you do after inserting SwitchTip into the tip bore during assembly?

    <p>Thread the assembly onto the gun</p> Signup and view all the answers

    What is the purpose of the trigger lock during assembly?

    <p>To prevent leaks</p> Signup and view all the answers

    Use Quizgecko on...
    Browser
    Browser