Swimlane Setup Methods
6 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which swimlane categorization method provides a "catch-all" swimlane for issues that don't match any other swimlane criteria?

  • By parent issue
  • By JQL query (correct)
  • By epic
  • By assignee
  • When using the "One assignee per swimlane" method, where do unassigned issues appear?

  • In a separate swimlane
  • Above the swimlanes
  • Below the swimlanes
  • The user can choose to place them above or below (correct)
  • In the "One project per swimlane" method, how are issues displayed?

  • Issues are displayed below their corresponding project swimlane (correct)
  • Issues are mixed and not categorized by project
  • Issues are displayed above their corresponding project swimlane
  • Issues are displayed in a separate swimlane labeled "Unassigned" if they don't belong to any project
  • Which swimlane method allows for dynamic categorization of issues based on a specific Jira field value?

    <p>By JQL query (C)</p> Signup and view all the answers

    Which method involves grouping issues based on the level of hierarchy within a Jira project?

    <p>By parent issue (A)</p> Signup and view all the answers

    Signup and view all the answers

    Flashcards

    Swimlanes in Jira

    Horizontal categorization for organizing issues on a board.

    Parent issue swimlane

    Swimlane that contains all sub-tasks of a single parent issue.

    JQL query swimlane

    Swimlane set up based on specific JQL queries for filtering issues.

    Default swimlanes

    Two automatic swimlanes: Expedite for Blocker priority and Everything Else for non-matching issues.

    Signup and view all the flashcards

    No swimlanes option

    Configuration where there’s no horizontal categorization of issues on certain boards.

    Signup and view all the flashcards

    Study Notes

    Swimlane Setup Methods

    • Swimlanes can be configured in various ways, based on different criteria.
    • Stories: One parent issue per swimlane. Sub-tasks fall under the parent. Issues without sub-tasks are displayed separately.
    • Queries: One JQL query per swimlane.
      • Expedite: Issues with a priority set to Blocker.
      • Everything Else: A catch-all swimlane for issues not matching other queries.
    • Assignees: One assignee per swimlane. Unassigned issues displayed separately.
    • Epics: One epic per swimlane. Issues not belonging to an epic will be grouped below. Hidden epics that aren't in the filter are shown. Epic order can be changed directly in the board's backlog.
    • Projects: One project for each swimlane. Issues displayed within their respective projects.
    • No Swimlanes: No horizontal grouping for issues on Scrum (Active sprints) or Kanban boards.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Explore the various methods for configuring swimlanes based on stories, queries, assignees, epics, and projects. This quiz will help you understand how to effectively organize and manage issues in Scrum and Kanban boards. Test your knowledge on the best practices for utilizing swimlanes in project management.

    Use Quizgecko on...
    Browser
    Browser