McCoy Global uses engineering drawings to communicate requirements to suppliers.
McCoy Global uses engineering drawings to communicate requirements to suppliers.
True (A)
McCoy Global conducts in-coming inspection of purchased items to verify supplier capabilities.
McCoy Global conducts in-coming inspection of purchased items to verify supplier capabilities.
False (B)
Critical suppliers are identified based on the design file, engineering drawing, and ERP software.
Critical suppliers are identified based on the design file, engineering drawing, and ERP software.
True (A)
McCoy Global only purchases from suppliers who are on the approved supplier list.
McCoy Global only purchases from suppliers who are on the approved supplier list.
McCoy Global does not assess the ability of suppliers to provide products, components and services.
McCoy Global does not assess the ability of suppliers to provide products, components and services.
Supply chain identifies potential suppliers without determining the planned scope of supply.
Supply chain identifies potential suppliers without determining the planned scope of supply.
McCoy Global has a product that cannot be determined to conform to stated requirements due to proprietary, legal and/or contractual arrangements.
McCoy Global has a product that cannot be determined to conform to stated requirements due to proprietary, legal and/or contractual arrangements.
A supplier can have multiple sites, and each site is considered the same supplier.
A supplier can have multiple sites, and each site is considered the same supplier.
Supply Chain evaluates the supplier's business using only one method.
Supply Chain evaluates the supplier's business using only one method.
All suppliers should have at least one of the QMS requirements in their quality management system.
All suppliers should have at least one of the QMS requirements in their quality management system.
The risk assessment takes into consideration only the criticality of the item/service provided.
The risk assessment takes into consideration only the criticality of the item/service provided.
A change of ownership of an existing supplier will not require re-evaluation of the site.
A change of ownership of an existing supplier will not require re-evaluation of the site.