Supplier Scope of Work for Electrical Process Heaters
20 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is included in the Supplier's Scope of Work?

  • Design, material selection, manufacture, inspection, testing, stamping, and delivery (correct)
  • Design, testing, and commissioning only
  • Custom clearance and delivery only
  • Only material selection and manufacture
  • What is the Supplier responsible for?

  • Only the design and manufacture
  • Only the inspection and testing
  • The design and delivery
  • The design, selection of materials and components, manufacturing, and testing (correct)
  • What is the Supplier's responsibility regarding drawings and documents?

  • The production of all drawings and documents related to the electrical equipment and materials (correct)
  • The production of all documents related to the electrical equipment only
  • The production of all drawings only
  • The production of all documents only
  • What is required as per approved Vendor list for electrical equipment and materials?

    <p>Make and Country of Origin</p> Signup and view all the answers

    What does the Supplier's Scope of Work include if not all works and required material are expressly mentioned in the specification?

    <p>Other services complete in every respect even if not all works and all required material are expressly mentioned in this specification</p> Signup and view all the answers

    What is the purpose of including a positive 10% performance margin in the calculation of power required for all design cases?

    <p>To ensure reliable operation at nominal voltage and frequency</p> Signup and view all the answers

    Why should the thyristors employed be sized to ensure that the maximum current flowing through them does not exceed 70% of their continuous rated current?

    <p>To prevent overheating and ensure reliable operation</p> Signup and view all the answers

    Why is it important to select the maximum watt density on the element surface to ensure no degradation of the process fluid/gas?

    <p>To prevent contamination of the process fluid/gas</p> Signup and view all the answers

    What is the purpose of verifying the element surface temperature and pressure drop across the heater using an industry recognized process design simulation package?

    <p>To validate the heater's performance under different operating conditions</p> Signup and view all the answers

    What requirement must be met for heaters to be designed to operate reliably at the maximum voltage?

    <p>Thyristors must be sized to limit maximum current flow</p> Signup and view all the answers

    What is the design life requirement for the equipment mentioned in the specification?

    <p>30 years</p> Signup and view all the answers

    How should the power of each heater be controlled according to the specification?

    <p>Zero-crossover mode</p> Signup and view all the answers

    What should the capacity of the transformer feeding the heater be, in relation to the kVA rating of the heater?

    <p>8 to 10 times</p> Signup and view all the answers

    What type of control should be used instead of burst firing control for large loads fed from relatively weak supply systems susceptible to electrical disturbances?

    <p>Single cycle control</p> Signup and view all the answers

    What must the design ensure regarding the mechanical stress and fatigue on the heater elements?

    <p>Minimum mechanical stress</p> Signup and view all the answers

    What is the purpose of utilizing a combination of fixed elements and a variable element in an electric heater?

    <p>To reduce the transformer ratings needed for the electric heater</p> Signup and view all the answers

    In what configuration should the load be set for a large electric heater?

    <p>Four-wire star or delta</p> Signup and view all the answers

    What protection measure should be included for the thyristors in an electric heater?

    <p>Over-current protection by ultra-rapid fuses</p> Signup and view all the answers

    What type of input signal is required for the control circuit of an electric heater?

    <p>4 to 20 mA D.C. signal with a linear relationship from 0 to 100 % power</p> Signup and view all the answers

    What is necessary if parallel operation of thyristors is required and approved by the company?

    <p>Current balancing shall be applied</p> Signup and view all the answers

    More Like This

    Supplier Rights and Ethical Practices Quiz
    15 questions
    Supplier Selection and Evaluation Quiz
    9 questions
    Supplier Relationship Management
    5 questions
    Use Quizgecko on...
    Browser
    Browser