Podcast
Questions and Answers
Which line indicates the minimum and maximum thresholds for the amount of work that should be available on the buffers?
Which line indicates the minimum and maximum thresholds for the amount of work that should be available on the buffers?
- Solid line
- Peaks
- Troughs
- Dotted lines (correct)
What does a peak above the solid line indicate?
What does a peak above the solid line indicate?
- Stow has gone too slow
- Induct has gone at the right speed
- Induct has gone too fast (correct)
- Induct has gone too slow
What does a trough indicate?
What does a trough indicate?
- Induct has gone at the right speed
- Induct has gone too fast
- Induct has gone too slow (correct)
- Stow has gone too slow