Podcast
Questions and Answers
Which of the following is the purpose of a site assessment?
Which of the following is the purpose of a site assessment?
- To educate the customer and gather information about the proposed site. (correct)
- To immediately begin construction.
- To analyze the electrical grid connection.
- To install solar panels rapidly.
What does a circuit combiner do?
What does a circuit combiner do?
- Increases the resistance in the circuit.
- Reduces the voltage of the power.
- Takes multiple inputs and produces a single output. (correct)
- Converts AC power to DC power.
When assessing a customer’s solar power needs, what is one of the first things to consider?
When assessing a customer’s solar power needs, what is one of the first things to consider?
- The amount of power currently used. (correct)
- The customer's budget for aesthetic enhancements.
- The color of the roof.
- The customer's preferred brand of solar panel.
When performing a site assessment, it is best to obtain copies of the customer’s electric bills for how long?
When performing a site assessment, it is best to obtain copies of the customer’s electric bills for how long?
What is a Solar Pathfinder or similar instrument used for?
What is a Solar Pathfinder or similar instrument used for?
To increase the level of voltage from an array of solar panels, how are two or more panels connected?
To increase the level of voltage from an array of solar panels, how are two or more panels connected?
To increase the level of current from an array of solar panels, how are several strings of panels wired?
To increase the level of current from an array of solar panels, how are several strings of panels wired?
Solar panel installation areas need to receive an average of how many hours of sunlight for best system performance?
Solar panel installation areas need to receive an average of how many hours of sunlight for best system performance?
Batteries should be installed in which type of environment?
Batteries should be installed in which type of environment?
What is the minimum size for roof ground wiring?
What is the minimum size for roof ground wiring?
Flashcards
Site Assessment
Site Assessment
Educates the customer about the potential benefits of a PV system and gathers site information.
Heat Load Analysis
Heat Load Analysis
Analyzes heat loss or gain in a home to optimize energy efficiency.
Roof Mounted Solar Panels
Roof Mounted Solar Panels
Arrays of solar panels installed on a building's roof.
Solar Irradiance
Solar Irradiance
Signup and view all the flashcards
Circuit Combiner
Circuit Combiner
Signup and view all the flashcards
Series Connection
Series Connection
Signup and view all the flashcards
Parallel Connection
Parallel Connection
Signup and view all the flashcards
Solar Pathfinder
Solar Pathfinder
Signup and view all the flashcards
Battery Installation
Battery Installation
Signup and view all the flashcards
Fall Protection
Fall Protection
Signup and view all the flashcards
Study Notes
- SETWORK 57102 comprises definitions, statement completions, calculations, estimations, descriptions, and true/false questions regarding solar power systems.
Definitions
- Site assessment educates the customer on the potential benefits of a PV system and gathers information about the proposed site.
- Heat load analysis analyzes heat loss or gain in a home.
- Roof mounted solar panels refers to solar panel arrays on a roof.
- Solar irradiance is sunlight intensity, measured in W/m2.
- A circuit combiner takes multiple inputs to produce a single output.
Statement Completion
- When assessing solar power needs, the amount of power currently being used is a primary consideration.
- It is best to obtain electric bills for the past 12 months during a site assessment.
- Crystalline silicon panels generate roughly 15 watts per square foot of space.
- A solar pathfinder or similar instrument gathers shading data.
- Connecting two or more panels in series increases voltage in a solar panel array.
- Wiring several strings of panels in parallel increases current in a solar panel array.
- Optimal solar panel installation areas need an average of six full hours of sunlight for best system performance.
- A pathfinder determines shade cover from 9:00 AM to 3:00 PM.
- Batteries should be installed in a protective environment at or near room temperature.
- Fall protection must be worn at heights of 6 feet.
- A roof ground should have a minimum of 6 AWG solid copper.
- Most charge controllers are size 12x24.
- On a Solar Pathfinderâ„¢ sun path chart, the vertical lines represent azimuth angles.
Calculations
- 1500 mA converts to 1.5 A.
- 3200kW converts to 3.2 MW.
- 5600Wh converts to 5.6 kWh.
- 5000kWh converts to 5 MWh.
- 5000 mAh converts to 5 Ah.
- 100Ah converts to 100000 mAh.
- With I = 5mA and R = 2kΩ, E = 10V
- With I = 50mA and R = 3kΩ, P = 7.5W
- With E = 3.2kV and I = 100A, P = 0.32MW
- With P = 6kW and R = 0.5 kΩ, I = 3.46A
- With energy consumption of 200kWh and a system voltage of 24V, battery capacity is 8333 Ah.
Descriptions
- Angle finder (Figure 2), Solar Pathfinder (Figure 4), Solmetric Suneye, Long-reel measure (Figure 1), Charge controller (Figure 33), FLA Battery (Figure 34)
True or False
- AGM batteries are maintenance-free and do not require special storage -- TRUE.
- Visual inspection of the roof is the primary method of evaluation -- TRUE.
- Installing solar panels at least 3 feet above ground level is one way to protect them -- FALSE.
- Solar panels require approximately 2 hours of intense sunlight to operate properly -- FALSE.
- Compass angles are referenced from either magnetic south or true south -- TRUE.
- Any shaded areas must be documented -- TRUE.
- Magnetic compasses may not give a true reading when used on a metal roof -- TRUE.
- Charge controllers are often located far from the batteries -- FALSE.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.