Podcast
Questions and Answers
Which of the following is not a deployment strategy in software engineering?
Which of the following is not a deployment strategy in software engineering?
- Incremental deployment
- Iterative deployment (correct)
- Staged deployment
- Cutover deployment
Which of the following is not a phase in the waterfall model of software engineering?
Which of the following is not a phase in the waterfall model of software engineering?
- Implementation
- Design
- Training (correct)
- Testing
Which of the following is one of the strengths of modified waterfall models?
Which of the following is one of the strengths of modified waterfall models?
- Interdependency is clear
- Milestones are clear
- Flexibility (correct)
- None of them
Which of the following statements about Scrum is incorrect?
Which of the following statements about Scrum is incorrect?
Which of the following is not an advantage of the V-model in software engineering?
Which of the following is not an advantage of the V-model in software engineering?
What is requirement discovery in software engineering?
What is requirement discovery in software engineering?
Which of the following statements about relationships in software design is correct?
Which of the following statements about relationships in software design is correct?
Which of the following diagrams has a hidden time dimension?
Which of the following diagrams has a hidden time dimension?
What is the main focus of an iterative model in software engineering?
What is the main focus of an iterative model in software engineering?
Which option correctly identifies a type of function measured by function point metrics?
Which option correctly identifies a type of function measured by function point metrics?
Which of the following statements about requirement specification is accurate?
Which of the following statements about requirement specification is accurate?
Which of the following is NOT considered an advantage of cutover deployment strategy?
Which of the following is NOT considered an advantage of cutover deployment strategy?
Which one is NOT a benefit of adhering to coding standards?
Which one is NOT a benefit of adhering to coding standards?
Which categorization technique is commonly used for system requirements in software engineering?
Which categorization technique is commonly used for system requirements in software engineering?
Which of the following statements incorrectly describes advantages of the iterative model?
Which of the following statements incorrectly describes advantages of the iterative model?
What main advantage does incremental deployment provide over traditional methods?
What main advantage does incremental deployment provide over traditional methods?
What is the primary focus of extreme programming (XP)?
What is the primary focus of extreme programming (XP)?
What does the single responsibility principle advocate?
What does the single responsibility principle advocate?
Which statement about Agile software development is incorrect?
Which statement about Agile software development is incorrect?
Which of the following is not a benefit of the incremental waterfall model?
Which of the following is not a benefit of the incremental waterfall model?
Which of the following statements accurately differentiates the spiral model from the pure waterfall model?
Which of the following statements accurately differentiates the spiral model from the pure waterfall model?
When comparing the pure waterfall model with the iterative model, what is true?
When comparing the pure waterfall model with the iterative model, what is true?
Which of the following is not considered an advantage of the prototype model in software engineering?
Which of the following is not considered an advantage of the prototype model in software engineering?
What characterizes method overriding as opposed to method overloading?
What characterizes method overriding as opposed to method overloading?
When comparing Scrum and XP, which statement is correct?
When comparing Scrum and XP, which statement is correct?
Which aspect about the iterative process differs from the waterfall model?
Which aspect about the iterative process differs from the waterfall model?
What best describes the waterfall model in software engineering?
What best describes the waterfall model in software engineering?
Which of the following statements about software methodologies is true?
Which of the following statements about software methodologies is true?
Which of the following is not a benefit of test-driven development?
Which of the following is not a benefit of test-driven development?
In object-oriented design, how do method overloading and method overriding differ?
In object-oriented design, how do method overloading and method overriding differ?
Which statement correctly describes the differences in flexibility of requirements between the spiral model and the waterfall model?
Which statement correctly describes the differences in flexibility of requirements between the spiral model and the waterfall model?
Which statement is inaccurate regarding the phase interactions in the waterfall model?
Which statement is inaccurate regarding the phase interactions in the waterfall model?
Which factors contribute to the rapid development of software products using the RAD method?
Which factors contribute to the rapid development of software products using the RAD method?
What best describes the unified process model?
What best describes the unified process model?
Which statement about Gantt and PERT charts is inaccurate?
Which statement about Gantt and PERT charts is inaccurate?
What is the primary focus of test-driven development (TDD)?
What is the primary focus of test-driven development (TDD)?
Which is not considered a benefit of using process models in software engineering?
Which is not considered a benefit of using process models in software engineering?
How is the iterative model characterized in software engineering?
How is the iterative model characterized in software engineering?
Which of the following is true regarding test-driven development (TDD)?
Which of the following is true regarding test-driven development (TDD)?
What is a key feature of Gantt charts compared to PERT charts?
What is a key feature of Gantt charts compared to PERT charts?
Which of the following is not an item for calculating function points in function point metrics?
Which of the following is not an item for calculating function points in function point metrics?
What is method overloading (MO) in object-oriented programming?
What is method overloading (MO) in object-oriented programming?
Which of the following is the best description of the Spiral model in software engineering?
Which of the following is the best description of the Spiral model in software engineering?
Which of the following is an advantage of distributed architecture in software engineering?
Which of the following is an advantage of distributed architecture in software engineering?
Which of the following is the best description of the incremental waterfall model in software engineering?
Which of the following is the best description of the incremental waterfall model in software engineering?
Which term describes a software development model that incorporates risk management into the development process?
Which term describes a software development model that incorporates risk management into the development process?
In the context of software engineering, what is a characteristic of distributed architecture?
In the context of software engineering, what is a characteristic of distributed architecture?
Which of the following is true regarding the Inputs in function point metrics?
Which of the following is true regarding the Inputs in function point metrics?
Flashcards
Deployment Strategy (Software Engineering)
Deployment Strategy (Software Engineering)
A planned approach to releasing software updates and features to users. This can involve multiple steps and environments
Waterfall Model Phase (Software Engineering)
Waterfall Model Phase (Software Engineering)
A phase in the software development lifecycle that has specific tasks and deliverables. Phases like Requirements, Design, and Testing are common in the Waterfall Model; Training is not part of the core model stages.
Modified Waterfall Model Strength
Modified Waterfall Model Strength
Flexibility in adapting to changing requirements during the software development process, providing better options than pure waterfall.
Scrum (Agile Software Development)
Scrum (Agile Software Development)
Signup and view all the flashcards
V-Model Advantage
V-Model Advantage
Signup and view all the flashcards
Requirement Discovery (Software Engineering)
Requirement Discovery (Software Engineering)
Signup and view all the flashcards
Relationship: Inheritance and Composition
Relationship: Inheritance and Composition
Signup and view all the flashcards
Diagram with Hidden Time Dimension
Diagram with Hidden Time Dimension
Signup and view all the flashcards
Spiral Model vs. Waterfall Model
Spiral Model vs. Waterfall Model
Signup and view all the flashcards
Prototype Model Advantage
Prototype Model Advantage
Signup and view all the flashcards
Scrum vs. XP
Scrum vs. XP
Signup and view all the flashcards
Waterfall Model
Waterfall Model
Signup and view all the flashcards
Test-Driven Development (TDD) Benefit
Test-Driven Development (TDD) Benefit
Signup and view all the flashcards
Method Overloading vs. Overriding
Method Overloading vs. Overriding
Signup and view all the flashcards
Method Overloading: Compile-time Polymorphism
Method Overloading: Compile-time Polymorphism
Signup and view all the flashcards
Method Overriding: Runtime Polymorphism
Method Overriding: Runtime Polymorphism
Signup and view all the flashcards
Method Overriding
Method Overriding
Signup and view all the flashcards
Method Overloading
Method Overloading
Signup and view all the flashcards
Extreme Programming (XP)
Extreme Programming (XP)
Signup and view all the flashcards
Single Responsibility Principle
Single Responsibility Principle
Signup and view all the flashcards
Agile Software Development
Agile Software Development
Signup and view all the flashcards
Incremental Waterfall Model Advantage
Incremental Waterfall Model Advantage
Signup and view all the flashcards
Iterative Model vs. Waterfall Model
Iterative Model vs. Waterfall Model
Signup and view all the flashcards
Pure Waterfall Model Risks
Pure Waterfall Model Risks
Signup and view all the flashcards
Function Point Metrics
Function Point Metrics
Signup and view all the flashcards
Spiral Model
Spiral Model
Signup and view all the flashcards
Distributed Architecture
Distributed Architecture
Signup and view all the flashcards
Incremental Waterfall Model
Incremental Waterfall Model
Signup and view all the flashcards
Software Development Cycle
Software Development Cycle
Signup and view all the flashcards
Software Development Process
Software Development Process
Signup and view all the flashcards
Object-Oriented Programming (OOP)
Object-Oriented Programming (OOP)
Signup and view all the flashcards
RAD Method Speed
RAD Method Speed
Signup and view all the flashcards
Unified Process Model
Unified Process Model
Signup and view all the flashcards
Gantt vs. PERT Charts
Gantt vs. PERT Charts
Signup and view all the flashcards
Test-Driven Development (TDD)
Test-Driven Development (TDD)
Signup and view all the flashcards
Process Model Benefit
Process Model Benefit
Signup and view all the flashcards
Iterative Development
Iterative Development
Signup and view all the flashcards
What is the difference between a Gantt chart and a PERT chart?
What is the difference between a Gantt chart and a PERT chart?
Signup and view all the flashcards
Iterative Model Advantage
Iterative Model Advantage
Signup and view all the flashcards
Cutover Deployment Strategy
Cutover Deployment Strategy
Signup and view all the flashcards
Coding Standard Benefit
Coding Standard Benefit
Signup and view all the flashcards
Requirement Specification (Software Engineering)
Requirement Specification (Software Engineering)
Signup and view all the flashcards
Incremental Deployment
Incremental Deployment
Signup and view all the flashcards
Domain Analysis (DA)
Domain Analysis (DA)
Signup and view all the flashcards
What is the concept of Evolutionary Prototyping?
What is the concept of Evolutionary Prototyping?
Signup and view all the flashcards
Study Notes
Question 1
- Staged deployment is not a deployment strategy in software engineering.
Question 2
- Training is not a phase in the waterfall model of software engineering.
Question 3
- Flexibility is one of the strengths of modified waterfall models.
Question 4
- Scrum does not use RAD to reduce project time.
Question 5
- Simplicity and ease of use are not advantages of the V-model.
Question 6
- Requirement discovery is the process of working with customers to understand their needs and gathering detailed requirements.
Question 7
- Encapsulation is an "is-a" relationship and composition is a "has-a" relationship.
- Inheritance is an "is-a" relationship and composition is a "has-a" relationship.
Question 8
- Sequence diagrams have a hidden time dimension.
Question 9
- The spiral model works in loops whereas the pure waterfall model uses a linear sequential model.
- The spiral model takes risk factors into consideration, unlike the pure waterfall model.
Question 10
- Shortening project time is not an advantage of the prototype model.
Question 11
- Scrum focuses on management and planning while XP focuses on pair programming and test-driven development.
Question 12
- A process model that breaks project activities down into linear, sequential phases, where each phase depends on the output of the previous phase.
Question 13
- Reducing the line of codes is not a benefit of test-driven development.
Question 14
- Method overloading occurs within a class whereas method overriding happens across multiple classes with inheritance.
Question 15
- XP is a software development methodology intending to improve software scalability and responsiveness to changing customer requirements.
Question 16
- Each module, class, or function should have responsibility over a single part of the functionality.
Question 17
- Agile is a set of guidelines, rather than a specific model.
- Agile uses iterative techniques throughout the entire software product lifecycle.
Question 18
- Inter-communication is not required during incremental waterfall.
Question 19
- The iterative model provides a runnable system earlier than the pure waterfall model.
Question 20
- System redundancy is for increasing system capacity.
Question 21
- Single command principle is not part of SOLID principle in software engineering.
Question 22
- Overloading methods with different parameter lists is an example of polymorphism.
Question 23
- Inexpensive is not an advantage of the Spiral Model.
Question 24
- Iterative and incremental models are types of Agile software development framework.
Question 25
- The optimization of processes and projects in software engineering is a benefit of using process models.
Question 26
- Client/server design is a type of architecture design in software.
Question 27
- Scientific research is not a technique for requirement elicitation.
Question 28
- Keeping the team on track is a benefit of using documents in software engineering.
Question 29
- Permission should be based on authorization instead of exclusion or authentication.
Question 30
- Modules is not a part of functional point metrics.
Question 31
- Method overloading happens in a single class but with multiple methods having the same name but varying parameter lists.
Question 32
- A spiral model is a software development process model that helps project teams decide what approach to take for a project.
- Risk-driven methodology where project teams use spiral lines.
Question 33
- Good performance is an advantage of a distributed architecture in software.
Question 34
- Waterfall models are used for different parts of requirements.
Question 35
- High-end computers, high-speed internet connections and a good working environment are reasons why RAD methods lead to quick development processes.
Question 36
- A unified process model combines an iterative and incremental model.
Question 37
- Gantt charts show the duration of tasks, PERT charts show dependencies between them.
Question 38
- TDD is a technique to create unit tests. This is done frequently during the development process.
Question 39
- Mutual understanding is a benefit of using process models in software engineering.
Question 40
- The iterative model starts with a simplified implementation and progressively adds complexity until the final system is complete.
Question 41
- Domain Analysis is used by software engineers to gather background information on users.
Question 42
- Requiring a smaller number of developers is not an advantage of the iterative model.
Question 43
- Low risks are an advantage of cutover deployment.
Question 44
- Synchronization functions are included in function point metric measurement.
Question 45
- Easier coding review is a benefit of using the coding standard.
Question 46
- Moscow is a method to classify and categorize system requirements.
Question 47
- Requirement specification documents the essential requirements of the software and external interfaces.
Question 48
- Staged deployment is a good strategy in software engineering.
Question 49
- Software development lifecycle (SDLC) provides a structured approach for developing software systems.
Question 50
- x = 4, y = 2, z = 6 is the result when the code runs.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.