Software Development Processes: Phases and Agile Methods
30 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which software development method involves interleaving specification, development, and validation?

  • Waterfall model
  • Agile methods
  • Integration and configuration
  • Incremental development (correct)

Why is there no universal process model that fits all software development types?

  • All software development requires identical resources
  • The software environment is always the same
  • There are no constraints in software development
  • Customer and regulatory requirements vary (correct)

In the Waterfall model, why is it difficult to respond to changing customer requirements?

  • Continuous validation of requirements
  • Frequent iterations throughout the development process
  • Dynamic adaptation to customer feedback
  • Inflexible partitioning of the project into distinct stages (correct)

Which type of systems is the Waterfall model appropriate for?

<p>Embedded systems (A)</p> Signup and view all the answers

What is the primary focus of integration and configuration in software development?

<p>Integrating and configuring reusable components or systems (B)</p> Signup and view all the answers

Why do agile methods involve frequent builds or iterations during development?

<p>To allow for quick adaptation to changing requirements (C)</p> Signup and view all the answers

What are the generic activities in all software processes?

<p>Specification, development, validation, evolution (A)</p> Signup and view all the answers

Which activity involves changing the software in response to changing demands?

<p>Evolution (D)</p> Signup and view all the answers

What is the main purpose of the requirements engineering process?

<p>Establishing required services and constraints (C)</p> Signup and view all the answers

Which activity involves checking the validity of the requirements?

<p>Requirements validation (B)</p> Signup and view all the answers

In the context of software specification, what does the term 'feasibility study' refer to?

<p>Evaluating technical and financial feasibility of building the system (B)</p> Signup and view all the answers

Why is requirements engineering often considered a challenging process?

<p>It requires understanding diverse system stakeholders' needs (B)</p> Signup and view all the answers

What is the primary goal of a software development process?

<p>To develop and evolve software (A)</p> Signup and view all the answers

What does SDLC describe?

<p>The entire life of software from conception to maintenance (A)</p> Signup and view all the answers

Which software process model involves breaking the software development into smaller, more manageable parts?

<p>Incremental model (A)</p> Signup and view all the answers

What is a key characteristic of the Agile software process model?

<p>It focuses on delivering a working product early and then iterating (A)</p> Signup and view all the answers

In the context of human-computer interaction design, what is an essential task in analyzing user behavior?

<p>Understanding basic human principles (C)</p> Signup and view all the answers

What does a set of ordered tasks in a software process aim to produce?

<p>Output of some kind (C)</p> Signup and view all the answers

What is one of the main characteristics of Component Based Software Development?

<p>Systematic reuse of in-house developed components (D)</p> Signup and view all the answers

Which types of components are integrated with a component framework like .NET or J2EE?

<p>Collections of objects available for remote invocation (C)</p> Signup and view all the answers

What are the generic activities in all software processes mentioned in the text?

<p>Specification, development, validation, and evolution (A)</p> Signup and view all the answers

Which software process model is NOT mentioned in the text?

<p>Component-based (D)</p> Signup and view all the answers

What is the primary goal of a software development process according to the text?

<p>To develop or evolve software (D)</p> Signup and view all the answers

Which characteristic is NOT associated with Scrum methodology based on the provided text?

<p>Allowing changes to functionality during a sprint (D)</p> Signup and view all the answers

What is a key advantage of incremental development over the waterfall model?

<p>Reduced cost of accommodating requirements (D)</p> Signup and view all the answers

Why is it challenging to produce documents reflecting every version of a system in incremental development?

<p>Managers require regular deliverables (B)</p> Signup and view all the answers

What does the text suggest about safety-related problems in software specification and design?

<p>They are very expensive to correct at the implementation stage (B)</p> Signup and view all the answers

In incremental development, why is it important for specification, development, and validation to be interleaved?

<p>To allow for rapid feedback across activities (D)</p> Signup and view all the answers

From a management perspective, why is the process sometimes not visible in incremental development?

<p>Systems are developed quickly (C)</p> Signup and view all the answers

What tends to happen to the system structure when new increments are added in incremental development?

<p>System structure degrades unless refactoring is done (A)</p> Signup and view all the answers

More Like This

Mastering Software Development Processes
5 questions
Software Development Process Overview
10 questions
RUP Phases and Evaluation
40 questions

RUP Phases and Evaluation

PermissibleMemphis8565 avatar
PermissibleMemphis8565
IS2 Parcial 1 Anki
41 questions
Use Quizgecko on...
Browser
Browser