Software Development Life Cycle (SDLC) Basics

IngenuousLove avatar
IngenuousLove
·
·
Download

Start Quiz

Study Flashcards

23 Questions

What is the primary purpose of the Waterfall model in software development?

To provide a structured and linear approach

The Waterfall model is characterized by its flexible structure.

False

Why is the software development lifecycle important?

To ensure the final product is of the highest quality and meets all requirements.

The Waterfall model requires comprehensive ______________________ in each phase.

documentation

What is the first phase of the Waterfall model?

Requirements

Match the following phases of the software development lifecycle with their descriptions:

Planning = Defines needed information, function, behavior, performance, and interfaces. Design = Data structures, software architecture, interface representations, algorithmic details. Implementation = Source code, database, user documentation, testing.

The software development lifecycle consists of only three phases.

False

What is the benefit of following a structured process in software development?

Identify and address issues early on, saving time and resources in the long run.

In which industry is the Waterfall model often used to ensure compliance with strict regulatory requirements?

Healthcare

The V-Model places a strong emphasis on the verification and validation phases.

True

What is the deliverable of the Requirements Phase in the V-Model?

User Requirements Specification (URS) document

The V-Model is often used in scenarios where thorough _______________ and documentation are critical.

testing

What is the primary focus of the System Design phase in the V-Model?

Preparing system architecture and design

Match the industry with its corresponding use of the Waterfall model.

Construction = Managing project scheduling and resources Defense and Aerospace = Ensuring thorough documentation, verification, and validation of software Healthcare = Ensuring compliance with strict regulatory requirements

The V-Model is an extension of the Agile software development methodology.

False

What is a potential drawback of the Incremental Model?

It leads to scope creep if not managed effectively

The Spiral Model is a software development methodology that combines the iterative and incremental approaches with elements of risk management.

True

What is the primary goal of the Planning phase in the Spiral Model?

To identify project objectives, constraints, and risks, and develop a plan to address them.

The Spiral Model is represented as a ______________, with each loop or phase representing a cycle of development activities.

spiral

When is the Incremental Model most suitable?

When there is a need to get basic functionality to the market early

The success of the Incremental Model depends on the quality and completeness of the first increment.

True

Match the phases of the Spiral Model with their descriptions:

Planning = Identify project objectives, constraints, and risks Risk Analysis = Identify potential risks and uncertainties related to the project Engineering = Develop the actual product Evaluation = Evaluate the product through reviews and testing

What is the benefit of using the Spiral Model in software development?

It combines the iterative and incremental approaches with elements of risk management, making it suitable for complex and uncertain projects.

Study Notes

SDLC Model

  • A framework that describes the activities performed at each stage of a software development project.
  • Ensures that the final product is of the highest quality by following a structured process.
  • Consists of several phases, including planning, design, development, testing, and maintenance.

Waterfall Model

  • A traditional software development methodology that follows a linear and sequential approach.
  • Each phase of the project must be completed before the next one begins.
  • Characterized by its rigid structure.
  • Importance:
    • Provides a well-defined and structured framework for software development.
    • Requires comprehensive documentation, which can be important for projects with strict regulatory or compliance requirements.

Phases of Waterfall Model

  • Requirements: defines needed information, function, behavior, performance, and interfaces.
  • Design: data structures, software architecture, interface representations, algorithmic details.
  • Implementation: source code, database, user documentation, testing.

Limitations of Waterfall Model

  • Not suitable for all projects, especially small projects or projects with very stable and well-defined requirements.
  • Dependency on the quality and completeness of the first increment.
  • Potential for scope creep if not managed effectively.

When to use the Incremental Model

  • Risk, funding, schedule, program complexity, or need for early realization of benefits.
  • Most of the requirements are known up-front but are expected to evolve over time.
  • A need to get basic functionality to the market early.
  • On projects with lengthy development schedules.
  • On a project with new technology.

Spiral SDLC Model

  • Combines the iterative and incremental approaches with elements of risk management.
  • Developed by Barry Boehm in the 1980s.
  • Designed to address the complexity and uncertainty often associated with software projects.

Phases of the Spiral Model

  • Planning: identifies project's objectives, constraints, and risks, and develops a plan to address these factors.
  • Risk Analysis: identifies potential risks and uncertainties related to the project and evaluates their impact on project goals.
  • Engineering: actual development of the product, which can follow different methodologies (e.g., Waterfall, Agile) depending on project requirements.
  • Evaluation: product is evaluated through reviews and testing.

V-Shaped SDLC Model

  • Also known as the Verification and Validation (V-Shape) model.
  • An extension of the traditional Waterfall model.
  • Places a strong emphasis on the validation and verification phases.
  • Often used in scenarios where thorough testing and documentation are critical.

V-Shaped Steps

  • Requirements Phase: gathers and understands the requirements of the software through interactions with the customer.
  • Deliverable: User Requirements Specification (URS) document.
  • System Design: prepares system architecture and design based on gathered requirements.
  • Deliverable: System Design Specification (SDS) document.
  • Module Design: creates detailed design of individual modules or components.

Learn about the software development lifecycle, a framework that describes the activities performed at each stage of a software development project. Understand why it's essential to follow a structured process.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Use Quizgecko on...
Browser
Browser