State FIVE indications that a fault has occurred in a centrifugal pump/motor set.
State FIVE indications that a fault has occurred in a centrifugal pump/motor set.
- Abnormal noise 2. Vibration 3. High temperature 4. Leakage 5. Low pressure
State a possible cause of each of the faults mentioned in the previous question.
State a possible cause of each of the faults mentioned in the previous question.
- Misalignment 2. Imbalance 3. Overloading 4. Seal failure 5. Blockage
Explain how a relief valve suitable for use on the air side of a compressor is reset after overhaul.
Explain how a relief valve suitable for use on the air side of a compressor is reset after overhaul.
The relief valve is reset by adjusting the spring tension to the specified pressure according to manufacturer's instructions.
Describe a pressure reducing valve suitable for supplying control air from the main starting air supply.
Describe a pressure reducing valve suitable for supplying control air from the main starting air supply.
Signup and view all the answers
Describe THREE types of wastage that may occur on the internal surfaces of a ship's side valve made of modular cast iron.
Describe THREE types of wastage that may occur on the internal surfaces of a ship's side valve made of modular cast iron.
Signup and view all the answers
Sketch a relief valve suitable for use on the air side of a compressor.
Sketch a relief valve suitable for use on the air side of a compressor.
Signup and view all the answers
Sketch a pressure reducing valve suitable for supplying control air from the main starting air supply.
Sketch a pressure reducing valve suitable for supplying control air from the main starting air supply.
Signup and view all the answers
Where should refrigerant gas bottles be stored?
Where should refrigerant gas bottles be stored?
Signup and view all the answers
What is the weakest part of a storage bottle for refrigerant?
What is the weakest part of a storage bottle for refrigerant?
Signup and view all the answers
How can it be determined if refrigerant has been leaking from gas bottles?
How can it be determined if refrigerant has been leaking from gas bottles?
Signup and view all the answers
State the TWO methods of recharging a refrigeration system and where the connection to the system should be made for EACH method.
State the TWO methods of recharging a refrigeration system and where the connection to the system should be made for EACH method.
Signup and view all the answers
How should excessive refrigerant be removed from the system without infringing MARPOL regulations?
How should excessive refrigerant be removed from the system without infringing MARPOL regulations?
Signup and view all the answers
Explain the meaning of '100% redundancy' in steering gears.
Explain the meaning of '100% redundancy' in steering gears.
Signup and view all the answers
What is 'single failure criteria' in steering gears?
What is 'single failure criteria' in steering gears?
Signup and view all the answers
Describe a pilgrim nut and its usage in ensuring correct fitting of a keyless propeller.
Describe a pilgrim nut and its usage in ensuring correct fitting of a keyless propeller.
Signup and view all the answers
Describe the construction of a salient pole a.c. generator rotor.
Describe the construction of a salient pole a.c. generator rotor.
Signup and view all the answers
How many poles would be required for a 50Hz supply and a rotational speed of 750rpm in an a.c. generator?
How many poles would be required for a 50Hz supply and a rotational speed of 750rpm in an a.c. generator?
Signup and view all the answers
What are the requirements for an internal light fitting in battery lockers?
What are the requirements for an internal light fitting in battery lockers?
Signup and view all the answers
Why are the requirements for an internal light fitting in battery lockers necessary?
Why are the requirements for an internal light fitting in battery lockers necessary?
Signup and view all the answers
Study Notes
Small Vessel Second Engineer 060-03 - Auxiliary Equipment Part I
- The examination is administered by the Scottish Qualifications Authority on behalf of the Maritime and Coastguard Agency.
- The examination is 2 hours long, from 1400-1600 hrs.
- Non-programmable calculators are permitted, and all formulae used must be stated with clear working and intermediate steps.
Auxiliary Equipment
- Types of wastage that can occur on the internal surfaces of a ship's side valve made of modular cast iron:
- Three types of wastage
- Centrifugal Pump/Motor Set:
- Five indications of a fault:
- Possible cause of each fault
- Relief Valve:
- Sketch of a relief valve suitable for use on the air side of a compressor
- Explanation of how the valve is reset after overhaul
- Pressure Reducing Valve:
- Description with a sketch of a pressure reducing valve suitable for supplying control air from the main starting air supply
Refrigeration System
- Safe storage and handling of refrigerant:
- Storage location of refrigerant gas bottles
- Weakest part of the storage bottle
- How to determine if refrigerant has been leaking from gas bottles
- Two methods of recharging a refrigeration system, including connection points
- How to remove excessive refrigerant from the system without infringing MARPOL regulations
Steering Gears
- Definition of:
- 100% redundancy
- Single failure criteria
Propeller and Thrust Bearing
- Description with a sketch of a pilgrim nut
- Explanation of how the pilgrim nut is used to ensure correct fitting of a keyless propeller
- Inspection of a main thrust bearing
Salient Pole A.C. Generator Rotor
- Description of the construction of a salient pole a.c. generator rotor
- Calculation of the number of poles required for a 50Hz supply, rotational speed of 750rpm
Battery Lockers
- Requirements for an internal light fitting
- Explanation of why the requirements are necessary
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Prepare for the Small Vessel Second Engineer certification exam for Auxiliary Equipment Part I administered by the Scottish Qualifications Authority on behalf of the Maritime and Coastguard Agency. The exam date is Friday, 02 February 2018, from 1400-1600 hrs. Candidates are allowed to use non-programmable calculators, with clear presentation of formulae and working methods.