Cochin Shipyard Jun-24
54 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which type of vessel is being designed and constructed for the European Client?

  • Fishing Vessel
  • Container Ship
  • Bulk Carrier
  • Hybrid Service Operation Vessel (correct)
  • In which month did Hooghly Cochin Shipyard Limited secure an order for 2 tugs?

  • April 2024
  • January 2024
  • February 2024
  • March 2024 (correct)
  • What is the weight class of the tug secured by Udupi Cochin Shipyard Limited?

  • 70T (correct)
  • 40T
  • 80T
  • 60T
  • Which company was awarded the order for the construction of 2 ASD Tugs?

    <p>Hooghly Cochin Shipyard Limited</p> Signup and view all the answers

    What option does the contract with the European Client include?

    <p>Two more Hybrid SOVs</p> Signup and view all the answers

    When is the Hybrid Service Operation Vessel expected to be delivered?

    <p>2026</p> Signup and view all the answers

    Which initiative is NOT mentioned in the contents of the Investor Presentation?

    <p>Technological Advancements</p> Signup and view all the answers

    What is the primary purpose of the letter addressed to the Compliance Departments of BSE and NSE?

    <p>To disseminate the investor presentation</p> Signup and view all the answers

    What is the design life of the new dry dock project?

    <p>100 Years</p> Signup and view all the answers

    Which of the following projects was inaugurated by the Hon’ble Prime Minister on January 17, 2024?

    <p>International Ship Repair Facility Project</p> Signup and view all the answers

    What is the capacity of the Shiplift in the ISRF project?

    <p>6000 T</p> Signup and view all the answers

    By when is the new dry dock expected to be fully operational?

    <p>August 2024</p> Signup and view all the answers

    How many passenger ferry boats will be provided according to the zero emission green vessels initiative?

    <p>8 Nos</p> Signup and view all the answers

    What is the design speed of the fully indigenised 100 passenger ferry boat?

    <p>9 Knots</p> Signup and view all the answers

    What is the total project cost of the new dry dock project?

    <p>Rs. 1,799 Cr</p> Signup and view all the answers

    Which crane capacity is specifically mentioned for the new dry dock?

    <p>600 T</p> Signup and view all the answers

    What significant event occurred in January 2024?

    <p>The International Ship Repair Facility and the first stepped Dry-dock were dedicated.</p> Signup and view all the answers

    Which of the following vessels was delivered in February 2024?

    <p>An Electric Hybrid 100 Pax Water Metro boat.</p> Signup and view all the answers

    What contract did CSL enter into in February 2024?

    <p>Medium Refits of Two Indian Naval Vessels.</p> Signup and view all the answers

    Which vessel's keel was laid in April 2024?

    <p>New Generation Diesel Electric 3800 DWT General Cargo vessel.</p> Signup and view all the answers

    What was the purpose of the Master Ship Repair Agreement (MSRA) signed in April 2024?

    <p>To facilitate the repair of US Naval vessels.</p> Signup and view all the answers

    What major achievement took place in March 2024 regarding high-end technology?

    <p>Maiden Surface run of High Endurance Autonomous Underwater Vehicle was successful.</p> Signup and view all the answers

    In which month did UCSL deliver 'Ocean Splendour'?

    <p>March 2024</p> Signup and view all the answers

    Which organization awarded CSL the Kerala Industrial Safety Award in 2023?

    <p>Government of Kerala.</p> Signup and view all the answers

    What is the target completion date for the Fast Charging LTO Battery project?

    <p>December 2023</p> Signup and view all the answers

    What is the initial corpus amount for the Maritime Start Up Engagement Programme?

    <p>Rs 50 Crores</p> Signup and view all the answers

    Which type of funding provides the highest amount per start-up in this engagement programme?

    <p>Pilot Grant Scheme</p> Signup and view all the answers

    What percentage of the total order book position is represented by the Defence category?

    <p>73%</p> Signup and view all the answers

    How many vessels are included in the Commercial - Domestic category?

    <p>18</p> Signup and view all the answers

    Which subsidiary is indicated with a specific value in the order book position?

    <p>Hooghly Cochin Shipyard Limited (HCSL)</p> Signup and view all the answers

    What is the approximate total order book position in terms of Rs Crores?

    <p>Rs 22,000 Crs</p> Signup and view all the answers

    Which category has the lowest number of vessels in the order book position?

    <p>Defence</p> Signup and view all the answers

    What is the approximate total value of shipbuilding order pipeline possibilities?

    <p>Rs. 10,000 Crs.</p> Signup and view all the answers

    What percentage of the ship repair orders is dedicated to defence?

    <p>59%</p> Signup and view all the answers

    Which of the following is NOT a category mentioned for order values?

    <p>Government - Foreign</p> Signup and view all the answers

    What is the approximate value of ship repair orders in Udupi Cochin Shipyard Limited?

    <p>Rs. 1,250 Crs.</p> Signup and view all the answers

    How much is the approximate order value of vessels for domestic clients?

    <p>Rs. 2,000 Crs.</p> Signup and view all the answers

    Which of the following order stages has a project value of Rs. 1,500 Crs.?

    <p>Govt./ RFP Stage</p> Signup and view all the answers

    What is the total value mentioned for other project proposals that are in the RFI/Mid Stage?

    <p>Rs. 50,000 Crs.</p> Signup and view all the answers

    What is the balance amount of orders to be recognized for shipping according to the relevant information?

    <p>Rs. 1,250 Crs.</p> Signup and view all the answers

    What was the profit before tax for FY 24 Q4 on a standalone basis?

    <p>345.48 Rs Crs</p> Signup and view all the answers

    What was the year-over-year percentage increase in turnover for the consolidated FY 24?

    <p>56%</p> Signup and view all the answers

    Which of the following figures represents the EPS for FY 24 consolidated?

    <p>29.77 Rs</p> Signup and view all the answers

    How much did the profit after tax increase in percentage from FY 23 to FY 24 consolidated?

    <p>143%</p> Signup and view all the answers

    What was the net worth for the standalone financials in FY 24?

    <p>5025.87 Rs Crs</p> Signup and view all the answers

    Which of the following statements is true regarding the EBITDA margins for FY 24 consolidated?

    <p>EBITDA margin was 32%</p> Signup and view all the answers

    What was the total income for FY 24 Q4 on a standalone basis?

    <p>1,304.87 Rs Crs</p> Signup and view all the answers

    Which vessel type has had the highest delivery count as per the status of vessels under construction?

    <p>Hybrid Electric Catamaran Hull</p> Signup and view all the answers

    In which year was the profit after tax for FY 24 Q4 standing at 264.67 Rs Crs?

    <p>FY 24</p> Signup and view all the answers

    What was the value of net debt for consolidated FY 24?

    <p>23.02 Rs Crs</p> Signup and view all the answers

    What was the increase in PAT margins for standalone FY 24 Q4 compared to FY 23 Q4?

    <p>163%</p> Signup and view all the answers

    Which of the following accounted for the largest share of the standalone revenue mix in FY 24 Q4?

    <p>Shipbuilding</p> Signup and view all the answers

    Which quarter showed a profit before tax increase of 493% on a standalone basis?

    <p>FY 24 Q4</p> Signup and view all the answers

    Which measurement demonstrates the return on equity for FY 24?

    <p>17%</p> Signup and view all the answers

    Study Notes

    Cochin Shipyard Limited Investor Presentation - Q4 FY24 Financial Results and Highlights

    • Date: May 31, 2024
    • Presentation Subject: Investor Presentation – Q4 FY24 Financial Results and Highlights
    • Purpose: Dissemination of Q4 FY24 financial results and highlights to members.
    • Attachments: Investor presentation document included in the submission

    Contents of Investor Presentation

    • Important Operational Events for Q4 FY24
    • Financial Performance Q4 FY24
    • Infrastructure Augmentation
    • Novel & Green Initiatives
    • Order Book Position

    Highlights - Orders

    • January 2024: Contract signed with a European client for a Hybrid Service Operation Vessel (Hybrid SOV) delivery in 2026.
    • March 2024: Hooghly Cochin Shipyard Limited (HCSL) secured an order for two 40T Bollard Pull ASD Tugs for Industrial Handling Pvt. Ltd.
    • April 2024: Udupi Cochin Shipyard Limited (UCSL) secured an order for a 70T Bollard Pull Tug for Polestar Maritime Limited.
    • May 2024: CSL secured an additional order from the same European client for a Hybrid SOV, with an option for two more vessels, anticipated completion by late 2026.
    • May 2024: UCSL secured an order for three 70T Bollard Pull Tugs for Ocean Sparkle Limited.
    • February 2024: CSL contracted with the Indian Navy for undertaking the Medium Refits of two Indian Naval Vessels.
    • April 2024: CSL signed a Master Ship Repair Agreement (MSRA) with the United States Navy, to repair US Naval vessels under Military Sealift Command at CSL.

    Highlights - Vessels Delivered

    • February 2024: India's first indigenously built Hydrogen Fuel Cell Vessel was flagged off by the Hon'ble Prime Minister.
    • February/April 2024: Two Electric Hybrid 100 Pax Water Metro boats were delivered to Kochi Metro.
    • March 2024: UCSL delivered "Ocean Splendour," a 62T Bollard Pull Tug for Ocean Sparkle Limited.
    • May 2024: UCSL delivered "Konna Star," a 70T Bollard Pull Tug for Polestar Maritime Limited.

    Highlights - Major Events

    • January 2024: The Hon'ble Prime Minister dedicated the International Ship Repair Facility (ISRF) and the world's first stepped Dry-dock to the nation, signifying a major milestone in augmenting India's Maritime capability.
    • February 2024: Steel cutting for a Zero Emission Feeder Container vessel for a European client was completed.
    • February 2024: Keel laying of three Hybrid Electric Catamaran Passenger vessels planned for Inland Waterways Authority of India (IWAI) by HCSL.
    • March 2024: CSL successfully completed the maiden surface run of a High Endurance Autonomous Underwater Vehicle (HEAUV). Also secured the prestigious Kerala Industrial Safety Award 2023 for safety excellence in Very Large Factories (Engineering).
    • April 2024: Keel laying of a 3,800 DWT General Cargo vessel, built for Wilson Shipowning AS, Norway, held at UCSL.

    Financial Performance Q4 FY24

    • Financial highlights are presented in tables containing turnover, profit before tax (PBT), profit after tax (PAT), earnings per share (EPS), and EBITDA for both standalone and consolidated periods of FY24 quarter and prior year quarter. Quantities are in (Rs. Crs.)
    • Revenue mix and key financial parameters (net worth, book value per share, net debt) are also shown.
    • Figures show substantial increases year-on-year in key financial indicators, including turnover and profits.

    Infrastructure Augmentation

    • New Dry Dock Project:
      • Dock size: 310m x 75/60m x 13m (stepped dry dock)
      • Design life: 100 years
      • Draught of vessel: Up to 9.5 m
      • Cranes: 600T, 75T, and 40T
      • Project cost: Rs. 1,799.00 Cr.
      • Expenditure till date: Rs. 1,312.49 Cr.
      • Operational by: Aug 2024.
    • International Ship Repair Facility (ISRF) Project:
      • Land Area: 16.254 ha
      • Marine Area: 16.15 ha
      • Shiplift capacity: 6,000 Tonnes
      • Project Cost: Rs. 970 Crore
      • Expenditure till date: Rs. 797.45 Crore
      • Operational by: Aug 2024.

    Novel & Green Initiatives

    • H2 Fuel Cell Vessel (Pilot Project by CSL): 100 Passenger Ferry Boat, completely indigenous technology, H2 Fuel Cell, and Solar Plant. Trials successful and operated in Varanasi on May 18, 2024.
    • Electric Catamaran Ferry (8 Nos): 8 vessels contracted by IWAI. Air-conditioned passenger area for 50 pax, 9 knots design speed, and fast charging 120 kWh target completion Dec 2023 – Nov 2024.

    Order Book Position

    • Total Order Book Position (Approximately): Rs.22,000 Crore
    • Order book figures for commercial, defense and government projects broken down by subsidiary.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on recent developments and contracts within the shipbuilding industry. This quiz covers topics related to vessel design, construction orders, and important initiatives in the sector. Perfect for students and professionals interested in maritime operations.

    More Like This

    Maritime Marvels
    8 questions

    Maritime Marvels

    FaultlessAlexandrite avatar
    FaultlessAlexandrite
    Maritime Manufacturing Culture
    12 questions
    Maritime Industry Overview
    10 questions

    Maritime Industry Overview

    AwesomeGreenTourmaline avatar
    AwesomeGreenTourmaline
    Use Quizgecko on...
    Browser
    Browser