Server and Switch Room Design Guidelines Quiz

SimplifiedOtter avatar
SimplifiedOtter
·
·
Download

Start Quiz

Study Flashcards

10 Questions

What are the general guidelines for setting up a new server or switch room?

Determine business requirements, find a secure, dry, and cool location with good power supply, and design for good ventilation.

What factors should be considered when amending an existing server or switch room?

Review business requirements for expansion or improvement, assess the objectives for the amendment, review any audit comments, and consider changing the location of the room if necessary.

What location considerations should be reviewed for a server room?

Review the surrounding hazards such as water, dust, extreme temperatures, high voltage switch room, and high electromagnetic interference. Consider the need for a raised floor if the room is on the ground floor.

What is recommended for organizing devices in the server room?

Install racks from a reputable supplier to organize servers, storage, and network equipment. Ensure power sockets are installed on both sides of the racks and that the equipment is placed on sturdy racks with ample space for maintenance and cable management.

What are the key considerations for designing a server or switch room?

Consider business requirements, secure and suitable location, good ventilation, and power supply. Also, review surrounding hazards, consider the need for a raised floor, and ensure proper organization and maintenance of equipment through racks and power socket installation.

What does RTO stand for, and what does it represent in the context of Business Impact Analysis?

RTO stands for Recovery Time Objective. It represents the targeted duration of time within which a business process must be restored after a disruption in order to avoid unacceptable consequences.

Explain the significance of determining RPO in the context of Business Impact Analysis.

RPO, or Recovery Point Objective, is significant as it defines the acceptable amount of data loss in case of a disruption. It helps in establishing the frequency of data backups and the level of data protection needed for the business.

What is the purpose of the Impact Matrix in Business Impact Analysis?

The Impact Matrix is used to assess the potential impact of different scenarios on the business, allowing for the prioritization of recovery efforts and resource allocation based on the severity of the impact.

In the context of Business Impact Analysis, what does BCP refer to, and how does it differ from the estimation of RTO and RPO?

BCP refers to Business Continuity Planning, which involves preparing for and recovering from potential disruptions. It differs from the estimation of RTO and RPO as BCP encompasses the overall strategies and plans for maintaining business operations, while RTO and RPO specifically focus on recovery time and data backup aspects.

What are the key considerations for determining the System Recovery priority in Business Impact Analysis?

The key considerations for determining the System Recovery priority include the criticality of the system/application, compliance and legal requirements, and the operational strain on the business resulting from its unavailability.

Test your knowledge of server and switch room design guidelines with this quiz. Explore general guidelines for setting up a new server/switch room or making amendments to an existing one. Topics covered include determining business requirements, selecting a suitable location, and ensuring a secure, dry, and cool environment.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Use Quizgecko on...
Browser
Browser