Safety and Electrical Circuits Quiz
4 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

How should oxy-acetylene tanks be stored?

  • Laying down on their side
  • Capped and vertical
  • Capped and chained vertically (correct)
  • Capped and chained horizontally

How do you connect an ammeter to check an electrical circuit?

  • In series parallel with load
  • In series with load (correct)
  • Across the voltage supply
  • In parallel with load

When applying solder to a splice connection, what is the proper procedure?

  • The solder is applied to the splice after it has been heated for a few seconds (correct)
  • The solder is applied at the instant that the heat is applied
  • The solder is applied directly to the soldering tip
  • None of the above

What is the first step in lighting oxy-acetylene equipment?

<p>Check pressure regulators on both cylinders (it has to be off pressure CCW) (C)</p> Signup and view all the answers

More Like This

Live and Neutral Conductor Shorting Quiz
6 questions
Electric Circuits Quiz Flashcards
10 questions
Electrical Circuits and Safety Quiz
42 questions
Use Quizgecko on...
Browser
Browser