Room Data Sheets Management SOP Quiz
10 Questions
0 Views

Room Data Sheets Management SOP Quiz

Created by
@ChivalrousTranscendental

Questions and Answers

What is the primary responsibility of the Engineering Department with respect to the Room Data Sheet (RDS)?

  • Archiving the approved copy of the RDS.
  • Preparing and reviewing the RDS for new and existing facilities. (correct)
  • Verifying data during qualification processes.
  • Sharing information copies of the approved RDS with concerned departments.
  • Which of the following elements is NOT specifically listed as required information during the preparation of an RDS?

  • Room Area (m2)
  • Room Volume (m3)
  • Room Temperature (°C) (correct)
  • AHU No.
  • Which document reference outlines the standard procedures for handling changes related to the Room Data Sheet?

  • Ref.Doc.No.QAD/SOP/GEN-001
  • Ref.Doc.No: QAD/SOP/GEN-007 (correct)
  • Ref.Doc.No.IPV/QAM/001
  • Ref.Doc.No.QAD/SOP/GEN-043
  • What should the Quality Assurance department do after approving the RDS?

    <p>Archive the approved copy and share it with relevant departments.</p> Signup and view all the answers

    In the context of the Room Data Sheet, which function does NOT fall under the User Department's responsibilities?

    <p>Send the RDS for archival</p> Signup and view all the answers

    What is the responsibility of Engineering personnel regarding the submission of drawings?

    <p>Submit the final drawing and previous copy before issuing a new drawing</p> Signup and view all the answers

    Which document specifically outlines the responsibility for the approval of drawings?

    <p>SOP for Quality Manual</p> Signup and view all the answers

    What is required from Engineering personnel when preparing a drawing?

    <p>Prepare the drawing using any compatible version of AUTOCAD software</p> Signup and view all the answers

    Which of these tasks is NOT assigned to the Quality Assurance Department?

    <p>Maintain the list of engineering drawings</p> Signup and view all the answers

    Which statement regarding the responsibilities defined in the procedure is accurate?

    <p>Engineering personnel are tasked with the modification and update of their drawings</p> Signup and view all the answers

    Study Notes

    Objective

    • Describes the procedure for creating and managing Room Data Sheets (RDS) in a standardized format.

    References & Associated Documents

    • Standard Operating Procedures (SOP) for various aspects including creation, quality management, incident handling, document control, and change control.

    Scope

    • Applicable to RDS standardization and management at Incepta Pharmaceuticals Ltd., Vaccine Division.

    Responsibility

    • Engineering Department:

      • Prepares and reviews RDS for new and existing facilities.
      • Sends RDS to user departments for review and archives the approved master copy with the QA department.
    • User Department:

      • Reviews area RDS for further approval.
    • Validation:

      • Verifies RDS data during qualification processes (IQ/OQ/PQ/Requalification).
    • Quality Assurance:

      • Approves area RDS and archives the approved copy.
      • Shares information copies of approved RDS with relevant departments.

    Safety Instruction and System Description

    • No specific safety instructions provided.

    Procedure for RDS Preparation

    • Collects essential information during RDS preparation:

      • Sequential serial number for the facility.
      • Room number and name.
      • AHU number covering the rooms.
      • Calculated room area (in m²), height (in m), and volume (in m³).
      • Required maintained class and environmental controls:
        • Room temperature (°C)
        • Relative humidity (RH%)
        • Differential pressure (Pa)
        • Room pressure (Pa) relative to ambient
        • Minimum air changes per hour (ACPH).
    • RDS becomes effective from the date of QA approval.

    Definition & Elaboration of Abbreviation

    • Room Data Sheet (RDS):

      • Provides design and HVAC system requirements based on area activity and equipment load.
    • Abbreviations Explained:

      • ACPH: Air Change Per Hour
      • CCF: Change Control Form
      • DCCF: Document Change Control Form
      • DPG: Differential Pressure Gauge
      • HVAC: Heating Ventilation & Air Conditioning
      • IQ: Installation Qualification
      • OQ: Operational Qualification
      • PQ: Performance Qualification
      • RDS: Room Data Sheet

    Engineering Drawings Procedure Overview

    • Applicable to all Engineering drawings at Incepta Pharmaceuticals Ltd., Vaccine Division.
    • Essential for the generation, distribution, and archival of drawings.

    Reference Documents

    • Standard Operating Procedures (SOPs) guide the process including:
      • Creation and Control SOP (Ref.Doc.No.QAD/SOP/GEN-001).
      • Preventive and Breakdown Maintenance SOPs (Doc.No.: ENG/SOP/GEN-001/002).
      • Quality Manual (Ref.Doc.No.IPV/QAM/001).
      • Incident & Deviation Management SOP (Ref.Doc.No: QAD/SOP/GEN-003).
      • Document Control SOP (Ref.Doc.No.QAD/SOP/GEN-043).
      • Change Control SOP (Ref.Doc.No.QAD/SOP/GEN-007).

    Responsibilities

    • Engineering Department:

      • Prepare, modify, and update drawings as required.
      • Submit final drawings (hardcopy and softcopy) to QA for archival.
      • Provide previous versions to QA before issuing new drawings.
      • Maintain an updated list of drawings.
      • Head of Engineering ensures SOP implementation.
    • Quality Assurance Department:

      • Approve drawings and ensure SOP compliance.
      • Archive both hardcopy and softcopy drawings.
      • Issue new drawings and manage destruction of obsolete copies.

    Drawing Preparation

    • Use compatible versions of AUTOCAD for drawing preparation.
    • Generate PDF versions and maintain soft and hard copies.
    • Assign drawing numbers following a specified format.
    • Include necessary details in the drawing title box.
    • Electrical and special equipment drawings should reference supplier copies.
    • Print drawings in A3/A2/A1 size based on readability and visibility.
    • Validate drawings until officially revised or modified.

    Drawing Size and Display

    • Display facility layouts and utility schematics near relevant areas for easy access.

    Drawing Number Generation

    • Format: XXX/YYY/ZZZ–CCC–DD where:
      • XXX = IPV (Incepta Pharmaceuticals Ltd., Vaccine Division)
      • YYY = Department/Section Code
      • ZZZ = Type or name of the drawing (3 letters)
      • CCC = Sequential drawing number (001-999)
      • DD = Version number (01-99)
    • Example: IPV/PRD/FCL–001–01 signifies a specific production department layout.

    Distribution and Archiving Workflow

    • Archive approved Active Copies in QA.
    • Share Information Copies with relevant departments or authorities.
    • Replace previous Active Copies with Obsolete Copy seals before distributing updates.
    • Distribution of drawings requires submission of the original soft copy to QA.

    Summary of Procedure Steps

    • Follow detailed steps for drawing preparation, numbering, printing, distribution, and archiving to maintain compliance and ensure effective documentation practices.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on the procedures for creating and managing Room Data Sheets (RDS) at Incepta Pharmaceuticals Ltd. This quiz covers standard operating procedures, responsibilities of departments, and the role of quality assurance in the RDS process. Enhance your understanding of RDS standardization and management within the vaccine division.

    More Quizzes Like This

    Use Quizgecko on...
    Browser
    Browser