Podcast
Questions and Answers
What is the primary responsibility of a land surveyor in the context of the text?
What is the primary responsibility of a land surveyor in the context of the text?
- Determining property boundaries and area (correct)
- Determining the soil's suitability for building weight
- Staking where test holes need to be made
- Preparing construction plans for new plants
What is the purpose of a tacheometric plan prepared by a surveyor for a consulting engineer?
What is the purpose of a tacheometric plan prepared by a surveyor for a consulting engineer?
- To position the plant for efficient construction and operation (correct)
- To determine the weight of the plant buildings
- To locate existing objects relevant to construction
- To stake where test holes should be made
Why is it necessary to conduct a soil investigation during the preliminary stages of design?
Why is it necessary to conduct a soil investigation during the preliminary stages of design?
- To extract soil samples for examination and testing (correct)
- To identify boundary lines of the property
- To locate water and electric lines
- To determine nearby road locations
What is the role of a conveyancer in the property transfer process mentioned in the text?
What is the role of a conveyancer in the property transfer process mentioned in the text?
What does a consulting engineer rely on a surveyor to locate during the preliminary design stages?
What does a consulting engineer rely on a surveyor to locate during the preliminary design stages?
Who will inspect the work of the builder as an agent of the client?
Who will inspect the work of the builder as an agent of the client?
What does the surveyor hired by the builder provide during construction?
What does the surveyor hired by the builder provide during construction?
Who checks the setting out provided by the surveyor hired by the builder?
Who checks the setting out provided by the surveyor hired by the builder?
In what circumstances is a surveyor hired by the consulting engineer used to measure work completed?
In what circumstances is a surveyor hired by the consulting engineer used to measure work completed?
Who checks the measurements performed by the consulting engineer's surveyor?
Who checks the measurements performed by the consulting engineer's surveyor?
Flashcards are hidden until you start studying