What is the primary consideration when deciding rail renewals?
What is the primary consideration when deciding rail renewals?
What is the main difference between casual renewal and scattered renewal?
What is the main difference between casual renewal and scattered renewal?
What is the maximum number of rails renewed in a year in scattered renewal?
What is the maximum number of rails renewed in a year in scattered renewal?
What is the main focus of Through Fitting Renewal (R)?
What is the main focus of Through Fitting Renewal (R)?
Signup and view all the answers
What is the criterion for prioritizing rail renewals?
What is the criterion for prioritizing rail renewals?
Signup and view all the answers
What is the minimum number of defective welds per track km that may require Through Rail Renewal?
What is the minimum number of defective welds per track km that may require Through Rail Renewal?
Signup and view all the answers
What is the consideration for end cropping with or without welding?
What is the consideration for end cropping with or without welding?
Signup and view all the answers
What is the characteristic of casual renewal?
What is the characteristic of casual renewal?
Signup and view all the answers
Why should carrying of rails and heavy articles on the head or shoulder be avoided?
Why should carrying of rails and heavy articles on the head or shoulder be avoided?
Signup and view all the answers
What should be done to kinked rails?
What should be done to kinked rails?
Signup and view all the answers
Why should punch marks on rails or marking by chisel be prohibited?
Why should punch marks on rails or marking by chisel be prohibited?
Signup and view all the answers
Where should new rails and sleepers for the next day’s work be hauled from?
Where should new rails and sleepers for the next day’s work be hauled from?
Signup and view all the answers
Who should sanction modifications to passenger line layouts?
Who should sanction modifications to passenger line layouts?
Signup and view all the answers
What should be made to remove materials lying alongside the track?
What should be made to remove materials lying alongside the track?
Signup and view all the answers
Why should standard rail sections be used when relaying points and crossings?
Why should standard rail sections be used when relaying points and crossings?
Signup and view all the answers
What is the guideline for handling and stacking of rails that should be followed?
What is the guideline for handling and stacking of rails that should be followed?
Signup and view all the answers
What method of relaying is recommended for carrying out track renewals with concrete sleepers?
What method of relaying is recommended for carrying out track renewals with concrete sleepers?
Signup and view all the answers
What should be replaced with standard crossings?
What should be replaced with standard crossings?
Signup and view all the answers
What precautions should be followed in addition to the manual method of relaying for LWR track?
What precautions should be followed in addition to the manual method of relaying for LWR track?
Signup and view all the answers
What should be fixed accurately when relaying points and crossings?
What should be fixed accurately when relaying points and crossings?
Signup and view all the answers
Why should joints on SRJ and lead rails be welded?
Why should joints on SRJ and lead rails be welded?
Signup and view all the answers
Who is responsible for the correct gauging of switches?
Who is responsible for the correct gauging of switches?
Signup and view all the answers
What should be examined before connecting stretcher bars?
What should be examined before connecting stretcher bars?
Signup and view all the answers
What should be done if a tongue rail does not fit properly against the stock rail?
What should be done if a tongue rail does not fit properly against the stock rail?
Signup and view all the answers
What is the purpose of the 'Summary of P.Way Material to be released' annexure?
What is the purpose of the 'Summary of P.Way Material to be released' annexure?
Signup and view all the answers
What information is required in the 'Name of work' section of the annexure?
What information is required in the 'Name of work' section of the annexure?
Signup and view all the answers
What is the purpose of the 'Weight of material' column in the annexure?
What is the purpose of the 'Weight of material' column in the annexure?
Signup and view all the answers
Who is responsible for signing off on the release of materials?
Who is responsible for signing off on the release of materials?
Signup and view all the answers
What is the purpose of the 'Remarks' column in the annexure?
What is the purpose of the 'Remarks' column in the annexure?
Signup and view all the answers
What information is required in the 'Period of execution of work' section?
What information is required in the 'Period of execution of work' section?
Signup and view all the answers
What is the purpose of the 'Test check' column in the annexure?
What is the purpose of the 'Test check' column in the annexure?
Signup and view all the answers
What is the purpose of the 'Category' column in the annexure?
What is the purpose of the 'Category' column in the annexure?
Signup and view all the answers
What is the role of the nominated administrative officer of the Headquarters?
What is the role of the nominated administrative officer of the Headquarters?
Signup and view all the answers
Why is the condition of rail checked before use?
Why is the condition of rail checked before use?
Signup and view all the answers
What happens to rails released from primary relaying?
What happens to rails released from primary relaying?
Signup and view all the answers
What is the priority decided by the administrative officer based on?
What is the priority decided by the administrative officer based on?
Signup and view all the answers
What happens after the Railway Board's sanction is received?
What happens after the Railway Board's sanction is received?
Signup and view all the answers
What is the purpose of ultrasonically testing rails?
What is the purpose of ultrasonically testing rails?
Signup and view all the answers
What is done to rails in secondary renewals if their condition is satisfactory?
What is done to rails in secondary renewals if their condition is satisfactory?
Signup and view all the answers
Who approves the final track renewal proposal?
Who approves the final track renewal proposal?
Signup and view all the answers
Study Notes
Types of Renewals
- There are three types of renewals: scattered renewals, casual renewals, and through fitting renewals.
- Scattered renewals involve replacing unserviceable rails, sleepers, and fastenings in isolated locations, with a maximum of 10 rails and/or 250 sleepers in a gang beat in a year.
- Casual renewals involve replacing unserviceable rails, sleepers, and fastenings with identical sections of serviceable and nearly the same vintage or new track components in isolated locations of continuous but small stretches.
- Through fitting renewals involve replacing liners and GRSPs/CGRSPs without replacing ERCs.
Factors Governing Permanent Way Renewal
- Criteria for rail renewal include the incidence of rail fractures/failures, wear on rails, maintainability of track to prescribed standards, expected service life in terms of Gross Million Tonnes of traffic carried, and plan-based renewals.
- Incidence of rail fractures/failures, particularly in sections with 5 withdrawals of rails per 10 km in a year due to fracture and/or rail flaws detected ultrasonically, takes priority in deciding rail renewals.
- Verification of proposals by the Track Cell in the Chief Engineer’s Office involves coordinating proposals, framing programs, deciding priority, and satisfying that the renewal is unavoidable.
Track Standards for Renewals
- The recommended section of rail to be adopted for track renewals is in accordance with Para 205.
- Rails should be ultrasonically tested before use, and kinked rails must be jim-crowed and straightened.
- Punch marks on rails or marking by chisel should be prohibited as they cause incipient failures.
Methods of Carrying out Renewal
- Complete track renewal can be carried out by using mechanical equipment or manual methods.
- Detailed instructions shall be issued by the Assistant Divisional Engineer regarding the method of relaying, which depends on site conditions and machine availability.
Manual Method of Relaying
- The method can be followed for single rail, 3 rail panel, and LWR track.
- Precautions described in Para 346 & 347 should be followed for LWR track.
- Any modification in the layout of passenger lines should be carried out with the sanction of the Commissioner of Railway Safety.
Relaying Points and Crossings
- Particular care should be taken to effect improvements in the lay out while relaying points and crossings.
- Renewal should be carried out with standard rail sections, in accordance with standard drawings.
- At least one rail length on either side of the turnout should have the same section of rail as the turnout.
- References must be fixed for the center line of the new assembly, with accurate fixing of the inter-section point of the turnout track and the main line track.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz covers different types of railway track maintenance, including renewal operations and their characteristics.