What is the maximum permissible speed for passenger trains on the ERS-KTYM-KYJ double line?

  • 90 km/h in both directions (correct)
  • 100 km/h in both directions
  • 100 km/h down, 90 km/h up
  • 90 km/h down, 100 km/h up
  • What is the ruling gradient for trains traveling from ERS to KYJ?

  • 2 in 100
  • 1 in 200
  • 1 in 100 (correct)
  • 1 in 50
  • What is the critical block section mentioned in the text?

  • ETM-KTYM (correct)
  • ERS-ERS 'C'
  • CNC-Halt
  • ERS-KYJ
  • What is the maximum axle load permitted on the mentioned route?

    <p>21.50 tonnes</p> Signup and view all the answers

    What is the system of working mentioned for ERN-ERS ‘C’ Cabin–KTYM - KYJ double line block?

    <p>Absolute block system</p> Signup and view all the answers

    What is the purpose of the 'VCU Reset' Push Button Switch mentioned in the text?

    <p>To de-energise 218 (Contactor for CE) and reset CE without causing a drop in BP</p> Signup and view all the answers

    When should the VCU Reset Switch be pressed for 20 seconds?

    <p>In case of TCN VCU (CDAC) identified by FLG1: 111/112 or higher version Software</p> Signup and view all the answers

    What should be done after pressing the VCU Reset Switch?

    <p>Ensure Display gets reboot and node numbers start progressing from FLG 0 – 504</p> Signup and view all the answers

    When is the VCU Reset Switch not operated?

    <p>In case of BHEL/ABB (other than ELS/ED locos)(IGBT) make SR fitted Locos</p> Signup and view all the answers

    What is the alternative to using the VCU Reset Switch to reset CE without causing a drop in BP?

    <p>Use “MCE Reset/VCU Reset” Push button provided in SB1 panel</p> Signup and view all the answers

    Study Notes

    Speed and Gradient

    • The maximum permissible speed for passenger trains on the ERS-KTYM-KYJ double line is not specified.
    • The ruling gradient for trains traveling from ERS to KYJ is not specified.

    Block Section and Axle Load

    • The critical block section mentioned in the text is not specified.
    • The maximum axle load permitted on the mentioned route is not specified.

    System of Working

    • The system of working mentioned for ERN-ERS ‘C’ Cabin–KTYM - KYJ double line block is not specified.

    VCU Reset Switch

    • The purpose of the 'VCU Reset' Push Button Switch is not specified.
    • The VCU Reset Switch should be pressed for 20 seconds when not specified.
    • After pressing the VCU Reset Switch, not specified.
    • The VCU Reset Switch is not operated when not specified.
    • The alternative to using the VCU Reset Switch to reset CE without causing a drop in BP is not specified.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge of railway terminology, regulations, and infrastructure with this quiz. From maximum axle loads to permissible speeds, this quiz covers a wide range of railway-related topics.

    More Like This

    Type 2 Diabetes Management
    10 questions
    VCU Dental Radiation Safety Certification
    16 questions
    Use Quizgecko on...
    Browser
    Browser