CEBU TECHNOLOGICAL UNIVERSITY MAIN CAMPUS Electrical Engineering Department offers a lecture on EE-IPC 425 titled __________
CEBU TECHNOLOGICAL UNIVERSITY MAIN CAMPUS Electrical Engineering Department offers a lecture on EE-IPC 425 titled __________
The Structure of the Electric Power Industry
The interconnected network for delivering power is also known as the ________
The interconnected network for delivering power is also known as the ________
grid
The Electric Power Industry Reform Act of 2001 is also known as R.A. ________
The Electric Power Industry Reform Act of 2001 is also known as R.A. ________
9136
It was predicted that the national demand for electricity would increase by nine percent (9%) annually for the next ________ years.
It was predicted that the national demand for electricity would increase by nine percent (9%) annually for the next ________ years.
Prior to RA 9136, the power industry was divided into three major sector-______, transmission, and distribution.
Prior to RA 9136, the power industry was divided into three major sector-______, transmission, and distribution.
NPC was the monopoly in the power ______ until Executive Order (EO) No. 215 opened the generation sector to IPPs.
NPC was the monopoly in the power ______ until Executive Order (EO) No. 215 opened the generation sector to IPPs.
In 2001, IPPs generated almost half of the country’s ______.
In 2001, IPPs generated almost half of the country’s ______.
With RA 9136, four (4) major sectors would be established—generation, transmission, distribution, and ______.
With RA 9136, four (4) major sectors would be established—generation, transmission, distribution, and ______.
The level of consumption and the rate shall be determined by the ERC after due notice and ______.
The level of consumption and the rate shall be determined by the ERC after due notice and ______.
Section 73 of the EPIRA after RA 11552 extended and enhanced as amended by RA ______.
Section 73 of the EPIRA after RA 11552 extended and enhanced as amended by RA ______.
In order to provide assistance to electricity consumers, especially those living below the poverty line, a socialized pricing mechanism called a lifeline rate for qualified marginalized end-users shall be set by the ERC which shall be exempted from the cross subsidy phase-out under this Act for a period of ______ years, unless otherwise extended by law.
In order to provide assistance to electricity consumers, especially those living below the poverty line, a socialized pricing mechanism called a lifeline rate for qualified marginalized end-users shall be set by the ERC which shall be exempted from the cross subsidy phase-out under this Act for a period of ______ years, unless otherwise extended by law.
The WESM was created by virtue of Section 30 of Republic Act No. ______.
The WESM was created by virtue of Section 30 of Republic Act No. ______.
The WESM is the venue for trading ______ as a commodity where prices are determined based on actual use (demand) and availability (supply).
The WESM is the venue for trading ______ as a commodity where prices are determined based on actual use (demand) and availability (supply).
Its objective is to establish a competitive, efficient, transparent and reliable market for ______.
Its objective is to establish a competitive, efficient, transparent and reliable market for ______.
Generators are dispatched according to their offer price from the cheapest to the most ______.
Generators are dispatched according to their offer price from the cheapest to the most ______.
The Philippine Electricity Market Corporation (PEMC) served as the autonomous group market operator and governing body of the Philippine Wholesale Electricity Spot Market (WESM) for over ten (10) ______.
The Philippine Electricity Market Corporation (PEMC) served as the autonomous group market operator and governing body of the Philippine Wholesale Electricity Spot Market (WESM) for over ten (10) ______.