Podcast
Questions and Answers
Quantity survey is a schedule of quantities of all the items of work in a ______
Quantity survey is a schedule of quantities of all the items of work in a ______
building
At the conceptual stage such estimation is done on the basis of conceptual drawings or in case of any non-availability of such drawings, it is done on ______ basis utilizing expertise and experience of specialist
At the conceptual stage such estimation is done on the basis of conceptual drawings or in case of any non-availability of such drawings, it is done on ______ basis utilizing expertise and experience of specialist
thumb-rule
At the execution stage the quantities are calculated based on the construction ______
At the execution stage the quantities are calculated based on the construction ______
drawings
Accuracy, thoroughness, and ability to reconcile quantity and cost at every point of time are the important qualities of a Good Quantity ______
Accuracy, thoroughness, and ability to reconcile quantity and cost at every point of time are the important qualities of a Good Quantity ______
Signup and view all the answers
Data Required for the Preparation of an Estimate or Quantity Survey ______ Complete and fully dimensioned drawings (i.e. plans, elevations, sections and other details) of the building or work in question are required.
Data Required for the Preparation of an Estimate or Quantity Survey ______ Complete and fully dimensioned drawings (i.e. plans, elevations, sections and other details) of the building or work in question are required.
Signup and view all the answers
Detailed specifications, giving the nature, quality and class of work, materials to be used, quality of the material, their proportions, and method of preparation are ______
Detailed specifications, giving the nature, quality and class of work, materials to be used, quality of the material, their proportions, and method of preparation are ______
Signup and view all the answers
Rates The rates of various of work, materials to be used in the construction, wages of different categories of labor (skilled or unskilled) and cost of transportation charges should be available for preparing an estimate of work cost. Actual Finished Work Quantities can be calculated from the actual work done in the project site. The quantities mainly can be calculated as: Quantity = Length × Width × (______ or Thickness)
Rates The rates of various of work, materials to be used in the construction, wages of different categories of labor (skilled or unskilled) and cost of transportation charges should be available for preparing an estimate of work cost. Actual Finished Work Quantities can be calculated from the actual work done in the project site. The quantities mainly can be calculated as: Quantity = Length × Width × (______ or Thickness)
Signup and view all the answers
Quantity = Area of cross-section × ______
Quantity = Area of cross-section × ______
Signup and view all the answers
Quantity = Length × ______
Quantity = Length × ______
Signup and view all the answers
______ = Length
______ = Length
Signup and view all the answers
Quantity = Number of ______
Quantity = Number of ______
Signup and view all the answers
Quantity = ______
Quantity = ______
Signup and view all the answers