Quantity survey is a schedule of quantities of all the items of work in a ______

building

At the conceptual stage such estimation is done on the basis of conceptual drawings or in case of any non-availability of such drawings, it is done on ______ basis utilizing expertise and experience of specialist

thumb-rule

At the execution stage the quantities are calculated based on the construction ______

drawings

Accuracy, thoroughness, and ability to reconcile quantity and cost at every point of time are the important qualities of a Good Quantity ______

<p>Surveyor</p>
Signup and view all the answers

Data Required for the Preparation of an Estimate or Quantity Survey ______ Complete and fully dimensioned drawings (i.e. plans, elevations, sections and other details) of the building or work in question are required.

<p>Drawings</p>
Signup and view all the answers

Detailed specifications, giving the nature, quality and class of work, materials to be used, quality of the material, their proportions, and method of preparation are ______

<p>required</p>
Signup and view all the answers

Rates The rates of various of work, materials to be used in the construction, wages of different categories of labor (skilled or unskilled) and cost of transportation charges should be available for preparing an estimate of work cost. Actual Finished Work Quantities can be calculated from the actual work done in the project site. The quantities mainly can be calculated as:  Quantity = Length × Width × (______ or Thickness)

<p>Height</p>
Signup and view all the answers

Quantity = Area of cross-section × ______

<p>Length</p>
Signup and view all the answers

Quantity = Length × ______

<p>Width</p>
Signup and view all the answers

______ = Length

<p>Quantity</p>
Signup and view all the answers

Quantity = Number of ______

<p>Units</p>
Signup and view all the answers

Quantity = ______

<p>Weight</p>
Signup and view all the answers

Flashcards

Quantity Survey

A schedule detailing the quantities of all work items in a building project.

Conceptual Stage Estimation

Estimation based on conceptual drawings or thumb-rule methods when drawings are unavailable, relying on specialist expertise.

Execution Stage Quantities

Quantities calculated at the execution stage are derived from construction drawings.

Qualities of a Good Quantity Surveyor

Important qualities include accuracy, thoroughness, and the ability to reconcile quantity and cost at all times.

Signup and view all the flashcards

Drawings Required for Estimation

Complete and fully dimensioned drawings are required for preparing an estimate or quantity survey.

Signup and view all the flashcards

Detailed Specifications

Detailed specifications outline the nature, quality, class of work, materials, proportions, and preparation methods.

Signup and view all the flashcards

Rates for Estimation

The rates of various works, materials, labor wages, and transportation costs are vital for accurate estimation.

Signup and view all the flashcards

Calculating Volume

Quantity is calculated by multiplying Length × Width × Height or Thickness.

Signup and view all the flashcards

Quantity Calculation

Quantity can be calculated by multiplying the area of the cross-section by the length.

Signup and view all the flashcards

Area Calculation

Quantity = Length × Width

Signup and view all the flashcards

Unit Counting

Quantity = Number of Units

Signup and view all the flashcards

Weight as Quantity

Quantity = Weight