Power Network Management Systems
5 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary purpose of integrating SCADA, PLC, RTU, IED, and HMI into power networks?

  • To reduce power transmission losses
  • To enable real-time monitoring and control of power distribution (correct)
  • To improve power generation efficiency
  • To increase power consumption demand
  • Which of the following functions is NOT typically performed by SCADA, PLC, RTU, IED, and HMI in power networks?

  • Voltage control
  • Load shedding
  • Fault prediction
  • Power quality analysis (correct)
  • What is the primary benefit of implementing load shedding in power networks?

  • To reduce power consumption during peak hours
  • To increase power generation capacity
  • To improve power transmission efficiency
  • To prevent power grid overload and blackouts (correct)
  • What is the purpose of synchronization in power networks?

    <p>To ensure consistent power frequency</p> Signup and view all the answers

    Which of the following systems is responsible for executing emergency procedures in power networks?

    <p>SCADA</p> Signup and view all the answers

    More Like This

    Use Quizgecko on...
    Browser
    Browser