PNS/BAFS PAES 191:2018 Testing Procedure Quiz
15 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the role of the representative of the test applicant?

  • Suspend or terminate the test as required
  • Organize the testing site conditions
  • Provide testing materials and cover variable costs
  • Carry out machine operation, adjustments, and repairs as needed (correct)
  • Under what conditions should the cacao grinder be tested?

  • In a location with poor lighting and ventilation
  • As installed for normal operation (correct)
  • After modifications have been made
  • When it has been recently purchased
  • What action can be taken if the cacao grinder stops during testing due to a breakdown?

  • Continue testing without considering the breakdown
  • Ignore the issue and complete the test
  • Terminate the test immediately
  • Suspend the test until the breakdown is resolved (correct)
  • Who is responsible for ensuring that the cacao grinder has been assembled and installed correctly?

    <p>The manufacturer/distributor/dealer</p> Signup and view all the answers

    What are some requirements for the test site conditions where the cacao grinder is to be tested?

    <p>Adequate ventilation, lighting, workspace, and material handling provisions</p> Signup and view all the answers

    What should be recorded during the performance test?

    <p>All data and observations on the record sheet provided in Annex D</p> Signup and view all the answers

    What laboratory analysis is required for the cacao nibs and cocoa liquor?

    <p>Determine the moisture content and particle size distribution</p> Signup and view all the answers

    What information should be included in the presentation of results?

    <p>The machine specifications, test data, power transmission diagram, and sieve arrangement</p> Signup and view all the answers

    What is the purpose of taking measurements with and without load?

    <p>To establish a baseline for comparison and evaluate the impact of load</p> Signup and view all the answers

    Which annex provides the laboratory procedure for moisture content and particle size analysis?

    <p>Annex E</p> Signup and view all the answers

    Which of the following is NOT part of the information provided in the text?

    <p>The procedure for assembling and installing the cacao grinder</p> Signup and view all the answers

    What is the purpose of the schematic diagram mentioned in the text?

    <p>To depict the power transmission system and sieve arrangement</p> Signup and view all the answers

    Where should the data from the performance test be recorded?

    <p>On the record sheet provided in Annex D</p> Signup and view all the answers

    What is the purpose of determining the moisture content and particle size of the cacao nibs and cocoa liquor?

    <p>To ensure compliance with product quality standards</p> Signup and view all the answers

    Based on the information provided, what can be inferred about the testing procedure?

    <p>It involves multiple stages, including performance testing and laboratory analysis</p> Signup and view all the answers

    More Like This

    Use Quizgecko on...
    Browser
    Browser