Planned Production Time in Apparel Manufacturing
5 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Deeds International has a production capacity of 48,000 garments in an ______ shift.

8-hour

Each worker must mark attendance on biometric machines attached to the ______ Management System (TMS).

Time

The factory operates ______ days a week excluding Sundays and national holidays.

6

The shift time runs from 0800hrs to 1700hrs, which includes a ______ minute break time.

<p>60</p> Signup and view all the answers

Raw material is first received in the ______ before moving to the cutting department.

<p>warehouse</p> Signup and view all the answers

Study Notes

Deeds International Overview

  • Deeds International is an apparel factory with a significant production capacity of 48,000 garments per 8-hour shift.
  • The factory employs approximately 2,500 workers specifically in the sewing department.

Garment Manufacturing Process

  • The garment manufacturing workflow includes several stages:
    • Warehouse
    • Cutting
    • Sewing
    • Dry process
    • Wet process
    • Semi-finishing
    • Finishing
  • Raw materials are first received at the warehouse and then transferred to the cutting department based on the production plan.

Shift and Attendance Management

  • Work shifts run from 08:00 to 17:00, including a 60-minute break.
  • Workers are required to mark attendance using biometric machines integrated with a Time Management System (TMS) to track IN & OUT times.

Factory Operations

  • The factory operates 6 days a week, excluding Sundays and national holidays.
  • Planned Production Time calculation is necessary for production efficiency assessment.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Description

This quiz focuses on the planned production time for Deeds International, an apparel factory. It covers the factory's capacity, manpower involved, and the different stages of the garment manufacturing process. Test your knowledge on the workflow and production planning in the apparel industry.

More Like This

Use Quizgecko on...
Browser
Browser