What role do building codes play in structural design?

  • Decide the location of the building
  • Determine the color palette of the building
  • Calculate the number of windows in the building
  • Help engineers find the appropriate sizes of structural members (correct)
  • What does stiffness refer to in structural engineering?

  • The shape of the building
  • The location of the building
  • The ability of a member to resist deformation under force (correct)
  • The color of the materials used in construction
  • How is stiffness expressed in structural engineering?

  • In colors per inch
  • In pounds per force
  • In pounds per degree for color variations
  • In pounds per inch for tensile or compressive forces (correct)
  • What information can engineers find using building code dimension tables?

    <p>Sizes of structural members</p> Signup and view all the answers

    Why do buildings withstand more loads than they are likely to bear?

    <p>To abide by safety regulations</p> Signup and view all the answers

    What is the purpose of calculating a member's stiffness and strength in structural design?

    <p>To assess the member's ability to resist deformation and forces</p> Signup and view all the answers

    What is the purpose of specifications in a building project?

    <p>To describe the construction work required for the project</p> Signup and view all the answers

    Why are structural calculations important in the plan check review process?

    <p>To ensure correctness and accuracy in the structural design</p> Signup and view all the answers

    What is the purpose of having a design contingency in cost estimates?

    <p>To provide a probable cost of construction at completion</p> Signup and view all the answers

    What is the relationship between drawings and specifications in a building project?

    <p>They complement each other in describing the construction work</p> Signup and view all the answers

    What is a common reason for carrying out a quantity survey during different design phases?

    <p>To provide a probable cost of construction</p> Signup and view all the answers

    In what order are specifications typically organized?

    <p>By divisions and sections representing trades involved</p> Signup and view all the answers

    What is one of the building permits required in the Philippines?

    <p>Residential building permit</p> Signup and view all the answers

    How many complete sets of Detailed Plans are required for a building permit in the Philippines?

    <p>Five sets</p> Signup and view all the answers

    What is the purpose of a building permit according to the text?

    <p>To ensure safety and compliance with regulations</p> Signup and view all the answers

    What is one of the documents needed if the property is not registered under the name of the applicant?

    <p>Affidavit of Consent of the Lot Owner for the construction of building/house</p> Signup and view all the answers

    Who typically prepares the final and most accurate estimate of construction cost according to the text?

    <p>A consultant</p> Signup and view all the answers

    Which professional must sign and seal the Bill of Materials and Specification document for a building permit?

    <p>Civil engineer or architect</p> Signup and view all the answers

    What permit is needed specifically for a billboard according to the text?

    <p>Billboard permit</p> Signup and view all the answers

    What is the significance of having a building permit?

    <p>To reduce public health hazards</p> Signup and view all the answers

    How many copies of Current Tax Receipt are required for a building permit in the Philippines?

    <p>Five copies</p> Signup and view all the answers

    Who issues the building permit according to the text?

    <p>Local authorities</p> Signup and view all the answers

    What does a building permit indicate according to the text?

    <p>That the work drawings are prepared by a registered professional and submitted to the governing authority</p> Signup and view all the answers

    What is the main focus of space planning in technical documentation building system design?

    <p>Efficient use of spaces</p> Signup and view all the answers

    How does having a building permit save money according to the text?

    <p>By reducing potential hazards of unsafe construction</p> Signup and view all the answers

    Which of the following is NOT considered an issue to be addressed before space planning?

    <p>Color scheme of the space</p> Signup and view all the answers

    What should be planned adequately to ensure that a space or room is well lit according to the text?

    <p>Lighting</p> Signup and view all the answers

    Why is it important to consider environmental controls in space planning?

    <p>To improve energy efficiency</p> Signup and view all the answers

    What determines the necessary rooms and areas that should be considered in space planning?

    <p>Number and demands of occupants</p> Signup and view all the answers

    In space planning, what is one way to avoid issues related to safety and protection?

    <p>Proper building construction</p> Signup and view all the answers

    Study Notes

    Building Design and Construction Process

    • The building design and construction process involves three stages: space planning, structural calculations, and specifications.

    Space Planning

    • Space planning refers to the utilization of space and how it is laid out and planned for efficient use.
    • Key considerations in space planning include:
      • Budget and time constraints
      • Separation of activities into zones
      • Intended use of the space
      • Number of occupants
      • Need for or availability of windows and doors
      • Access and use of the space for people with disabilities
      • Requirement for furniture, fixtures, and fittings
      • Balancing and symmetry of the space
      • Security, safety, and privacy
      • Environmental controls and welfare facilities
      • Views and surroundings
      • Need for flexibility or future growth

    Calculations

    • Structural calculations involve working out the design load and designing the structure accordingly.
    • Engineers use building code dimension tables to find the appropriate sizes of structural members.
    • They also calculate the stiffness and strength of members.
    • Stiffness refers to a member's ability to resist deformation when subjected to a force.
    • Stiffness is expressed as a ratio of force to deformation.

    Specifications

    • Specifications are written descriptions of the construction work required for a project.
    • Drawings are a diagrammatic presentation of the construction work.
    • Specifications are addressed to the prime contractor and are organized into divisions and sections.
    • Sample content of specifications includes:
      • General requirements
      • Site work
      • Concrete
      • Masonry
      • Metals
      • Woods and plastics
      • Thermal and moisture protection
      • Doors and windows
      • Finishes
      • Specialties
      • Equipment
      • Furnishings
      • Special construction
      • Conveying systems
      • Mechanical
      • Electrical

    Quantity Survey and Cost Estimates

    • A quantity survey provides a probable cost of construction at completion of the schematic design, design development, and construction document phases.
    • A design contingency is usually carried in cost estimates.
    • The architect prepares a final and most accurate estimate of construction cost at completion of the construction documents.

    Building Permit

    • A building permit is an official certificate of permission issued by local authorities to construct, enlarge, or alter a building.
    • Importance of having a building permit:
      • Ensures safety by reducing potential hazards of unsafe construction
      • Ensures that construction projects meet safety requirements
      • Protects property values
      • Saves money
      • Makes reselling easier
    • Types of building permits:
      • Residential building permit
      • Commercial building permit
      • Revision building permit
      • Demolition building permit

    Building Permit Requirements in the Philippines

    • Building permit application forms (5 copies) duly signed and sealed by engineers concerned
    • Electrical permit forms (3 copies)
    • Sanitary permit forms (3 copies)
    • Five (5) complete sets of detailed plans
    • For construction of two-storey building: Structural design analysis – signed and sealed by Civil Engineer at every page
    • For construction of more than two-storey building:
      • Boring and plate load test
      • Seismic analysis
    • Proof of property
    • Photocopy of transfer certificate of title (TCT)
    • Photocopy of tax declaration of property (Certified True Copy) – 5 copies
    • Photocopy of current tax receipt (5 copies)
    • If property is not registered under the name of the applicant:
      • Submit 5 copies of any of the following:
        • Contract of lease
        • Contract of sale
        • Affidavit of consent of the lot owner
        • Deed of absolute sale
    • Permit billboard
    • Bill of materials and specification (5 copies) – signed and sealed by an engineer or architect at every page

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Learn about the importance of structural calculations in the plan check review process by the local building department. Explore how specifications and drawings are essential elements in a building project.

    More Like This

    Use Quizgecko on...
    Browser
    Browser