Pilot Plant Scale-Up Technique

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

Pilot plant studies can be beneficial to address issues related to the many-fold increase in ______.

scale

It is not possible to design a large-scale production plant from ______ data alone with any degree of success.

laboratory

A pilot plant can be used for producing small quantities of product for sensory, chemical, and ______ evaluations.

microbiological

The effectiveness of the pilot plant requires a good relationship between the pilot plant group and the ______ group.

<p>R&amp;D</p> Signup and view all the answers

Scientists with experience in pilot plant operations as well as in actual ______ are the most preferable.

<p>production</p> Signup and view all the answers

The space required in the pilot plant is divided into four areas: Administration, Physical testing area, Standard pilot-plant equipment, and ______ area.

<p>Storage</p> Signup and view all the answers

Adequate office and desk space should be provided for both scientists and ______.

<p>technicians</p> Signup and view all the answers

Permanent bench top space should be provided for routinely used physical-testing ______.

<p>equipment</p> Signup and view all the answers

A pilot plant allows the investigation of a product and process on an intermediate scale before committing to full-scale ______.

<p>production</p> Signup and view all the answers

The pilot plant is crucial for evaluating ______ and practical manufacturing procedures.

<p>processes</p> Signup and view all the answers

Intermediate-sized and full-scale production equipment is essential in evaluating the scale-up effects of research ______.

<p>formulations</p> Signup and view all the answers

During pilot plant studies, it is important to establish ______ controls to ensure product quality.

<p>environmental</p> Signup and view all the answers

Equipment used should be made ______ so that after use it can be stored in the small storeroom.

<p>portable</p> Signup and view all the answers

Key steps in scale-up include defining product ______ based on market size.

<p>economics</p> Signup and view all the answers

The pilot plant serves as a ______ for designing the full-scale production system.

<p>prototype</p> Signup and view all the answers

It should have two areas divided as approved and unapproved area for active ingredient as well as ______.

<p>excipient</p> Signup and view all the answers

A thorough review of each aspect of the formulation is important for understanding the purpose of each ______.

<p>ingredient</p> Signup and view all the answers

It is important to conduct preliminary larger-than-laboratory studies with equipment to aid in ______ design.

<p>plant</p> Signup and view all the answers

Evaluating pilot plant results helps determine whether to proceed with full-scale plant ______.

<p>development</p> Signup and view all the answers

One of the main responsibilities of the pilot plant is the approval & validation of the raw ______.

<p>materials</p> Signup and view all the answers

The most economical, simple, and efficient equipment capable of producing a product within the proposed ______ is used.

<p>specifications</p> Signup and view all the answers

To avoid problems associated with scale-up, it is essential to conduct thorough ______ of the formula.

<p>testing</p> Signup and view all the answers

The immediate and future market trends/requirements are considered while determining the production ______.

<p>rates</p> Signup and view all the answers

The order of mixing and drying ______ are critical elements in process evaluation.

<p>temp</p> Signup and view all the answers

Flashcards

Pilot Plant

A scaled-down version of a manufacturing plant, used to test and refine a process before full-scale production.

Scale-up

Increasing the size or volume of a process or product from pilot plant to full-scale production.

Pilot Plant Objectives

Testing the process, evaluating the formula, avoiding problems, and providing production controls, Master Manufacturing Formula and process evaluation.

Scale-up Steps

A series of steps to increase production size from pilot plant to full-scale, including economic analysis, laboratory studies, rate controlling step analysis, construction etc.

Signup and view all the flashcards

Product Economics

Analysis of the profitability of a product to define market-related manufacturing costs.

Signup and view all the flashcards

Rate-Controlling Steps

Identifying the critical steps in a process that impact production rates.

Signup and view all the flashcards

Pilot Plant Construction

Building a pilot plant that includes features like process control, environmental controls, cleaning systems, packaging, waste handling, and meeting regulations.

Signup and view all the flashcards

Pilot plant results evaluation

Assessing the findings of the pilot study using the data collected, with the possibility of making corrections and deciding on proceeding to a full-scale plant development.

Signup and view all the flashcards

Production Equipment

Essential equipment for evaluating large-scale effects of research formulations and processes, designed for portability and easy cleaning.

Signup and view all the flashcards

Storage Areas

Designated areas for approved and unapproved active ingredients, excipients, in-process materials, finished products, and packaging materials.

Signup and view all the flashcards

Formula Review

Thorough analysis of the formulation ingredients, their roles, and how the lab-scale results translate to larger production, anticipating stress changes.

Signup and view all the flashcards

Raw Material Approval

Pilot plant ensures raw materials (active ingredients and excipients) are suitable for large-scale production.

Signup and view all the flashcards

Equipment Sizing

Choosing the most cost-effective and efficient equipment that fits the planned production size, avoiding oversized or undersized equipment to conserve resources.

Signup and view all the flashcards

Production Rates

Setting production rates based on current and future market demand.

Signup and view all the flashcards

Process Evaluation

Analysis of critical process parameters like mixing order and drying temperatures.

Signup and view all the flashcards

Scale-up Effects

The influence of using equipment and processes designed for larger quantities on the overall outcome of a product or process.

Signup and view all the flashcards

Pilot plant studies

Studies conducted on a small-scale to evaluate larger-scale production processes.

Signup and view all the flashcards

Pilot plant use cases

Evaluating lab results, producing small products, and gathering data for full-scale production decisions.

Signup and view all the flashcards

Pilot plant personnel

Scientists experienced in pilot plant and production operations with engineering knowledge and computer skills are crucial.

Signup and view all the flashcards

Pilot plant relationship

Effective pilot plant operations depend on good collaboration between pilot plant, R&D, and formulation teams.

Signup and view all the flashcards

Pilot plant space

Pilot plant space should be divided into administration, physical testing, standard equipment, and storage areas.

Signup and view all the flashcards

Administration space

Pilot plant administration area should have adequate office space adjacent to the working area.

Signup and view all the flashcards

Physical Testing Area

The area should have permanent bench space for regularly used physical testing equipment.

Signup and view all the flashcards

Standard Equipment Space

Provides pilot plant equipment space for different types of dosage forms suitable for manufacturing.

Signup and view all the flashcards

Study Notes

Pilot Plant Scale-Up Technique

  • A plant is a location where resources (money, materials, people, methods, and machines) come together to make products.
  • A pilot plant is part of the pharmaceutical industry. It transforms a lab-scale formula into a viable product. It's used for producing small quantities of new tech-based products, developing reliable, practical manufacturing procedures, and is a pre-commercial production process.
  • Scale-up is the process of designing a prototype using pilot plant data, increasing batch size, or applying a process to different output volumes.

Objectives of Pilot Plant

  • Test the process on a model of a proposed plant before a large investment in a production unit.
  • Evaluate the formula's ability to withstand changes in batch scale and process modifications.
  • Avoid issues associated with scale-up.
  • Outline guidelines for production and process controls.
  • Identify process critical features.
  • Prepare and provide Master Manufacturing Formula.
  • Evaluate and validate processes and equipment.

Scale-Up Steps

  • Define product economics based on market size and competitive pricing, ensuring allowable manufacturing costs.
  • Conduct lab studies and scale-up planning simultaneously.
  • Define critical steps in the proposed process.
  • Conduct preliminary large-scale studies using equipment for the critical steps. This supports plant design.
  • Design and construct a pilot plant, including process and environmental controls, cleaning, sanitizing systems, and waste management compliant with regulations.
  • Evaluate pilot plant results to make necessary corrections to the product and process, evaluate economics and determine whether to continue with large-scale plant development.

Why Conduct Pilot Plant Studies?

  • Allow investigation of a product and process on an intermediate scale before committing to large-scale production.
  • Help address the difficulty in predicting the effects of large-scale increases in size.
  • Useful when large-scale production plants are not possible through lab data alone.

Pilot Plant Uses

  • Validate lab study results, adjusting products and processes.
  • Produce small quantities of products for sensory, chemical, microbiological evaluation, limited market testing, and stability studies.
  • Decide whether to proceed with full-scale production and design/modify existing plants based on pilot plant data.

General Considerations

  • Reporting Responsibility: Effective pilot plants require strong relationships between the pilot plant team and other groups (R&D, formulators).

Personnel Requirements

  • Ideal personnel have experience in pilot and production plant operations, understanding the formulator's intent and production personnel perspectives. Suitable personnel also have knowledge of engineering principles, computers, and electronics.

Space Requirements

  • Pilot plant space is divided into administration/processing, physical testing, standard equipment, and storage areas. Administrative space should be adjacent to working space. Physical testing areas should have permanent benchtops for equipment. Adequate standard equipment space for manufacturing all dosage forms is needed. Portable equipment allows for storage in a dedicated room. Cleaning space for equipment is critical. Storage areas should be for approved versus unapproved active ingredients and excipients; in-process materials, finished bulk products, and pilot plant/scale-up batches. Packaging material needs a designated storage space.

Review of the Formula

  • Thoroughly review every aspect of the formulation for understanding their purpose and contribution to the final product using small-scale lab equipment.
  • Help predict scaling effects associated with stress testing during equipment changeover.

Raw Materials

  • Pilot plants also approve and validate raw materials (active ingredients, excipients). Small-scale production raw materials are not always representative of large-scale production.

Equipment

  • Select economical, simple, and efficient equipment suitable for producing the product. Equipment size should match planned production scale. Too small produces insufficient product. Too large wastes expensive active ingredients.

Production Rates

  • Determining production rates requires consideration for both immediate and future trends and requirements.

Process Evaluation

  • Evaluating drying temperature and time, screen size (solids), filters size (liquids), order of mixing, speed, mixing time, heating and cooling rates, and addition rates of granulating agents, solvents and drug solutions.
  • Evaluating process parameters helps optimize and validate processes.

Validation

  • The process remains validated if formula, ingredient quality, and equipment configuration stay the same. Annually review and revalidate manufacturing process and quality control information.

Master Manufacturing Procedures

  • The main aspects include weight sheets, processing directions, and manufacturing procedures.
  • Weight sheets clearly identify chemicals by name and batch number to prevent errors.
  • Processing directions are precise and explicit, including addition rates, mixing time/speed, heating/cooling rates, temperature, and storage.
  • Manufacturing procedures are written by the actual operators.

Product Stability and Uniformity

  • Pilot plants ensure physical and chemical stability of products.
  • Every pilot batch representing a final formulation must undergo stability testing.
  • Stability testing should also be conducted on finished packaged product.

Transfer of Analytical Method to Quality Assurance

  • During scale-up, ensure transfer of analytical test methods from research to the quality assurance department.
  • This process should review the process to validate instrumentation availability. Personnel training is crucial for conducting tests correctly.

GMP Considerations

  • GMP checklist includes equipment qualification, process validation, preventive maintenance schedules, process review/revalidation, relevant standard operating procedures, competent personnel, training provisions, technology transfer system, and validated cleaning procedures. Well-organized equipment placement is crucial to ease material flow and prevent cross-contamination.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Use Quizgecko on...
Browser
Browser