What is a requirement for the test site conditions?

  • The site must have provisions for grain handling and workspace. (correct)
  • The site must have electricity readily available at all times.
  • The site should have a waiting area for spectators.
  • The site should be located indoors to avoid weather issues.
  • What option is available to the manufacturer if the test materials exceed recommended characteristics?

  • The manufacturer can request a different testing agency.
  • The manufacturer is not allowed to make any changes.
  • The manufacturer has the option to proceed with the test. (correct)
  • The manufacturer must cancel the test.
  • What must be verified before testing begins?

  • The corn mill must be assembled and installed correctly. (correct)
  • The corn mill must be painted according to specifications.
  • The corn mill must be the newest model available.
  • The area must be inspected for noise levels.
  • During the running-in period, what adjustments are permitted?

    <p>Adjustments according to manufacturer’s recommendations are allowed.</p> Signup and view all the answers

    Under what circumstance would a test be suspended?

    <p>If the machine stops due to major breakdown or malfunctions.</p> Signup and view all the answers

    What is the minimum weight for representative samples of corn kernels used in each test trial?

    <p>1 kilogram</p> Signup and view all the answers

    How many samples should be collected from the outlets of the different components during each test trial?

    <p>Three samples</p> Signup and view all the answers

    What type of containers should samples for moisture content testing be kept in?

    <p>Airtight containers</p> Signup and view all the answers

    What is required for the measurement of data during a test run?

    <p>Minimum of five observations</p> Signup and view all the answers

    What must be done to the fuel tank before testing a corn mill using an engine?

    <p>The tank must be filled to full capacity</p> Signup and view all the answers

    Study Notes

    Philippine Agricultural Engineering Standard PAES 211:2000

    • Standard for methods of testing corn mills, initiated by AMTEC, funded by BPRE of the Department of Agriculture
    • Reviewed by a Study Team and Technical Committee on Postharvest Machinery
    • Circulated for comments and reactions to various private and government organizations
    • Presented to PSAE and subjected to public hearing organized by NAFC
    • Formulated in accordance with PNS 01: Part 4:1998
    • Comments and reactions considered in finalizing the standard
    • References made to Primer on Philippine Grains Standardization Program - National Food Authority, 1998

    Contents (PAES 211:2000)

    • Scope: Methods of test and inspection for corn mills
    • Reference: Normative documents (e.g., PAES 210:2000, ISO 6540:1980)
    • Definitions: Terms such as "aspirator", "bulk density," etc.
    • General Conditions for Test and Inspection: Roles of manufacturer/dealer, representative, site conditions, suspension of tests
    • Test Preparation: Preparation of devices, testing instruments (Annex A), test materials
    • Pre-test Observation: Verification of specifications, test materials
    • Performance Test: Operation of the corn mill, sampling, data collection (duration, noise measurement, speed of component, fuel/energy consumption) (Annex D, E, F, G)
    • Laboratory Analysis: Procedures for determining efficiency, losses, percentage of corn grits (Annex G, F)
    • Test Report: Required information (title, summary, purpose & scope, methods, conditions, description of machine, results, observations, names & signatures) (Annex H)
    • Annexes: Detailed list of equipment, test materials, specifications, data sheets, formulas

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test methods for corn mills are outlined in the Philippine Agricultural Engineering Standard PAES 211:2000. This standard was developed by AMTEC with input from various stakeholders and includes definitions, conditions for testing, and references to normative documents. It aims to ensure accurate and reliable performance assessments of corn milling machinery.