Perforation Process Safety Equipment Quiz

GenialTopaz avatar
GenialTopaz
·
·
Download

Start Quiz

Study Flashcards

Questions and Answers

______ involves preparing a drilled well for hydrocarbon production after drilling is complete by installing specific equipment and methods to control and optimize fluid flow while ensuring wellbore integrity and safety.

Single Zone Completion

In ______, the well is left open without any casing or liner in the reservoir section, suitable for stable formations where the wellbore does not require additional support.

Single Zone Completion

Advantages of ______ include increased reservoir contact, as leaving the formation exposed maximizes the wellbore's contact with the productive zone potentially leading to higher production rates.

Single Zone Completion

______ involves preparing a drilled well for hydrocarbon production after drilling is complete by installing specific equipment and methods to control and optimize fluid flow while ensuring wellbore integrity and safety in multiple zones.

<p>Multiple Zone Completion</p> Signup and view all the answers

______ is a method where two reservoirs are completed in the same wellbore using one string of tubing.

<p>Single string dual completion</p> Signup and view all the answers

______ is a method where two reservoirs are completed in the same wellbore using two separate strings of tubing.

<p>Twin string dual completion</p> Signup and view all the answers

Part 3 Lec. 1 Production Engineering focuses on Completion and ______ types of casing

<p>Perforation</p> Signup and view all the answers

Perforation in well refers to creating channels in the casing and cement for communication between reservoir and ______

<p>wellbore</p> Signup and view all the answers

The selection of perforation depth involves a comprehensive analysis by petroleum engineers and ______

<p>geoscientists</p> Signup and view all the answers

Perforations are typically placed in the most productive zones of the reservoir to maximize hydrocarbon ______

<p>production</p> Signup and view all the answers

Single Zone Completion focuses on completing one productive zone, while Multiple Zone Completion focuses on completing ______ zones

<p>multiple</p> Signup and view all the answers

The choice of the depth of perforation in petroleum wells is influenced by factors such as reservoir thickness, permeability, porosity, pressure, and fluid ______

<p>type</p> Signup and view all the answers

Single Zone Completion: Cased hole completions allow for easier access to the wellbore for future workover operations, such as stimulation or zone changes. Advantages include flexibility for future interventions and _______________.

<p>wider applicability</p> Signup and view all the answers

Multiple Zone Completion: Cased hole completions are more versatile and applicable to a broader range of reservoir conditions compared to openhole completions. Disadvantages include reduced reservoir contact and potential formation damage. In contrast, advantages include flexibility for future interventions and _______________.

<p>wider applicability</p> Signup and view all the answers

Single string dual completion: Casing, cement, perforating equipment, and additional rig time significantly increase the overall cost of cased hole completions compared to open-hole. This is a disadvantage of single string dual completion, alongside potential completion issues and limited data acquisition. However, this type of completion provides flexibility for future interventions and _______________.

<p>wider applicability</p> Signup and view all the answers

Twin string dual completion: Perforating and cementing operations can damage the formation near the wellbore, hindering flow and reducing productivity. This is a disadvantage of twin string dual completion, alongside higher cost and potential completion issues. On the other hand, twin string dual completion provides flexibility for future interventions and _______________.

<p>wider applicability</p> Signup and view all the answers

Multiple string completion: Casing hinders direct access to the formation, potentially limiting data acquisition and reservoir characterization. This is a disadvantage of multiple string completion, along with formation damage and higher cost. Nonetheless, multiple string completion offers flexibility for future interventions and _______________.

<p>wider applicability</p> Signup and view all the answers

Multilateral Completion: In this type, multiple wellbores are drilled from a single main wellbore, branching out in different directions to access different zones or reservoirs. This technique improves overall productivity and resource recovery by providing flexibility for future interventions and _______________.

<p>wider applicability</p> Signup and view all the answers

More Quizzes Like This

Perforation Shots
5 questions

Perforation Shots

BetterKnownSilver avatar
BetterKnownSilver
Gastrointestinal Perforation Quiz
5 questions
Groundwater Percolation Process Quiz
25 questions
Well Perforation Equipment
9 questions

Well Perforation Equipment

BuoyantMountainPeak avatar
BuoyantMountainPeak
Use Quizgecko on...
Browser
Browser