Podcast
Questions and Answers
______ involves preparing a drilled well for hydrocarbon production after drilling is complete by installing specific equipment and methods to control and optimize fluid flow while ensuring wellbore integrity and safety.
______ involves preparing a drilled well for hydrocarbon production after drilling is complete by installing specific equipment and methods to control and optimize fluid flow while ensuring wellbore integrity and safety.
Single Zone Completion
In ______, the well is left open without any casing or liner in the reservoir section, suitable for stable formations where the wellbore does not require additional support.
In ______, the well is left open without any casing or liner in the reservoir section, suitable for stable formations where the wellbore does not require additional support.
Single Zone Completion
Advantages of ______ include increased reservoir contact, as leaving the formation exposed maximizes the wellbore's contact with the productive zone potentially leading to higher production rates.
Advantages of ______ include increased reservoir contact, as leaving the formation exposed maximizes the wellbore's contact with the productive zone potentially leading to higher production rates.
Single Zone Completion
______ involves preparing a drilled well for hydrocarbon production after drilling is complete by installing specific equipment and methods to control and optimize fluid flow while ensuring wellbore integrity and safety in multiple zones.
______ involves preparing a drilled well for hydrocarbon production after drilling is complete by installing specific equipment and methods to control and optimize fluid flow while ensuring wellbore integrity and safety in multiple zones.
Signup and view all the answers
______ is a method where two reservoirs are completed in the same wellbore using one string of tubing.
______ is a method where two reservoirs are completed in the same wellbore using one string of tubing.
Signup and view all the answers
______ is a method where two reservoirs are completed in the same wellbore using two separate strings of tubing.
______ is a method where two reservoirs are completed in the same wellbore using two separate strings of tubing.
Signup and view all the answers
Part 3 Lec. 1 Production Engineering focuses on Completion and ______ types of casing
Part 3 Lec. 1 Production Engineering focuses on Completion and ______ types of casing
Signup and view all the answers
Perforation in well refers to creating channels in the casing and cement for communication between reservoir and ______
Perforation in well refers to creating channels in the casing and cement for communication between reservoir and ______
Signup and view all the answers
The selection of perforation depth involves a comprehensive analysis by petroleum engineers and ______
The selection of perforation depth involves a comprehensive analysis by petroleum engineers and ______
Signup and view all the answers
Perforations are typically placed in the most productive zones of the reservoir to maximize hydrocarbon ______
Perforations are typically placed in the most productive zones of the reservoir to maximize hydrocarbon ______
Signup and view all the answers
Single Zone Completion focuses on completing one productive zone, while Multiple Zone Completion focuses on completing ______ zones
Single Zone Completion focuses on completing one productive zone, while Multiple Zone Completion focuses on completing ______ zones
Signup and view all the answers
The choice of the depth of perforation in petroleum wells is influenced by factors such as reservoir thickness, permeability, porosity, pressure, and fluid ______
The choice of the depth of perforation in petroleum wells is influenced by factors such as reservoir thickness, permeability, porosity, pressure, and fluid ______
Signup and view all the answers
Single Zone Completion: Cased hole completions allow for easier access to the wellbore for future workover operations, such as stimulation or zone changes. Advantages include flexibility for future interventions and _______________.
Single Zone Completion: Cased hole completions allow for easier access to the wellbore for future workover operations, such as stimulation or zone changes. Advantages include flexibility for future interventions and _______________.
Signup and view all the answers
Multiple Zone Completion: Cased hole completions are more versatile and applicable to a broader range of reservoir conditions compared to openhole completions. Disadvantages include reduced reservoir contact and potential formation damage. In contrast, advantages include flexibility for future interventions and _______________.
Multiple Zone Completion: Cased hole completions are more versatile and applicable to a broader range of reservoir conditions compared to openhole completions. Disadvantages include reduced reservoir contact and potential formation damage. In contrast, advantages include flexibility for future interventions and _______________.
Signup and view all the answers
Single string dual completion: Casing, cement, perforating equipment, and additional rig time significantly increase the overall cost of cased hole completions compared to open-hole. This is a disadvantage of single string dual completion, alongside potential completion issues and limited data acquisition. However, this type of completion provides flexibility for future interventions and _______________.
Single string dual completion: Casing, cement, perforating equipment, and additional rig time significantly increase the overall cost of cased hole completions compared to open-hole. This is a disadvantage of single string dual completion, alongside potential completion issues and limited data acquisition. However, this type of completion provides flexibility for future interventions and _______________.
Signup and view all the answers
Twin string dual completion: Perforating and cementing operations can damage the formation near the wellbore, hindering flow and reducing productivity. This is a disadvantage of twin string dual completion, alongside higher cost and potential completion issues. On the other hand, twin string dual completion provides flexibility for future interventions and _______________.
Twin string dual completion: Perforating and cementing operations can damage the formation near the wellbore, hindering flow and reducing productivity. This is a disadvantage of twin string dual completion, alongside higher cost and potential completion issues. On the other hand, twin string dual completion provides flexibility for future interventions and _______________.
Signup and view all the answers
Multiple string completion: Casing hinders direct access to the formation, potentially limiting data acquisition and reservoir characterization. This is a disadvantage of multiple string completion, along with formation damage and higher cost. Nonetheless, multiple string completion offers flexibility for future interventions and _______________.
Multiple string completion: Casing hinders direct access to the formation, potentially limiting data acquisition and reservoir characterization. This is a disadvantage of multiple string completion, along with formation damage and higher cost. Nonetheless, multiple string completion offers flexibility for future interventions and _______________.
Signup and view all the answers
Multilateral Completion: In this type, multiple wellbores are drilled from a single main wellbore, branching out in different directions to access different zones or reservoirs. This technique improves overall productivity and resource recovery by providing flexibility for future interventions and _______________.
Multilateral Completion: In this type, multiple wellbores are drilled from a single main wellbore, branching out in different directions to access different zones or reservoirs. This technique improves overall productivity and resource recovery by providing flexibility for future interventions and _______________.
Signup and view all the answers