Questions and Answers
What is the first step in the PBM design methodology?
Identifying customer network requirements
During which process of the PBM Plan phase does Step 2 occur?
Assessment
Which activity is performed in Step 2 of the PBM design methodology?
Gap analysis
What does the network assessment in Step 2 evaluate?
Signup and view all the answers
Which phase includes all the steps of the PBM design methodology?
Signup and view all the answers
Study Notes
Design Methodology for PBM
- The design methodology for PBM consists of three steps.
Identifying Customer Network Requirements
- This step involves identifying requirements and proposing a conceptual architecture.
- Occurs in the Strategy and Analysis process of the PBM Plan phase.
Characterizing the Existing Network
- In this step, the network is assessed.
- A gap analysis is performed to determine the necessary infrastructure to meet the requirements.
- The network is assessed based on function, performance, and quality.
- Occurs in the Assessment process of the PBM Plan phase.
Designing Network Topology and Solutions
- This step involves designing the network topology and solutions.
- Occurs in the Plan Phase.
General Notes
- All three steps of the design methodology occur in the Plan Phase.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.