Painting and Coating Process

WellManagedBugle avatar
WellManagedBugle
·
·
Download

Start Quiz

Study Flashcards

16 Questions

Distemper is usually used for holding the ______.

paint

The Economy paint range is priced between ______ to ______.

60-70

The last step in the Water proofing process is to apply ______ proof - 2 coats.

Damp

The coverage area of distemper is ______ sq.meter.

50-60

The formula for calculating the painting area is ______ area * 3.5.

carpate

The first step in the Metal Cleaning process is ______ cleaning (Paper 60).

Surface

The first step in the Wood furniture painting process is ______ / cleaning (Paper 600).

sanding

The coverage area of 2K Damp proof is ______ sq.feet.

40-50

What is the purpose of using Distemper in the painting process?

To hold the paint

What is the next step after sanding in the Repaint process?

Repairing Holes

What is the recommended course of action for a roof with more than 40% water damage?

Clean the roof until the brick comes out and then apply Damp proof

What is the purpose of using KPF-Knieting paste filler in the Metal Cleaning process?

To fill in scratches

What is the first step in the Wood furniture painting process?

Sanding/Cleaning (Paper 600)

What is the recommended course of action for a roof with 4-11% water damage?

Use 2K Damp proof

What is the purpose of using Red oxide (Primer) in the Metal Cleaning process?

To prime the surface

What is the next step after applying putty in the Repaint process?

Sanding

Study Notes

Paint Finishing

  • Economy paint finish: Tactor Ace, price range 60-70
  • Premier paint finish: Apcolite Apex, price range 80-90
  • Luxury paint finish: Royal Ultima, price range 100-110

Steps of Painting

  • Steps involved in painting process: pop (10mm), sanding, premier, putty (2 coats), sanding, premier, topcoat (2 coats)
  • Steps involved in repaint process: sanding, repair holes, putty, apply primer, apply two coats of paint

Painting Area Calculation

  • Painting area is calculated as carpet area multiplied by 3.5
  • Carpet area is calculated as length multiplied by breadth

Distemper

  • Distemper is used to hold paint and has a coverage of 50-60 sq. meters

Wood Furniture Process

  • Steps involved in wood furniture process: sanding/cleaning (paper 600), wood putty, 2 coats of paint

Metal Cleaning Process

  • Steps involved in metal cleaning process: surface cleaning (paper 60), KPF - knieting paste filler, red oxide (primer) - 1 coat, top coat paint - 2

Water Proofing

  • No waterproofing required for 0-3% water seepage
  • 2K Damp proofing required for 4-11% water seepage, coverage area - 40-50 sq. feet
  • Hydro lock required for 11-20% water seepage, coverage area - 40-50 sq. feet
  • Hydro lock/2K damp lock required for 20-40% water seepage
  • For above 40% water seepage, clean the roof until brick comes out and then apply 2K damp lock or hydro lock

Types of Primer used in Waterproofing

  • Dampshed Interior (DSI)
  • Dampshed Exterior (DSE)

Waterproofing Process

  • Use wire brush to clean the roof
  • Use pressure water to clean the roof
  • Repair cracks - if crack is 5-10mm, it is repairable, but more than 10mm, use cement
  • Apply Damp proof (1 coat) - primer coat with diluted 3:1
  • Final step is Damp proof - 2 coats

Paint Finishes and Processes

  • Economy paint finish: 60-70, uses Tractor and Ace
  • Premier paint finish: 80-90, uses Apcolite and Apex
  • Luxury paint finish: 100-110, uses Royal and Ultima

Steps of Painting

  • POP (10mm) as the first step
  • Sanding as the second step
  • Applying premier coat
  • Applying two coats of putty
  • Sanding again
  • Applying premier coat again
  • Finally, applying two coats of topcoat

Repaint Process

  • Sanding as the first step
  • Repairing holes
  • Applying putty
  • Applying primer
  • Applying two coats of paint

Painting Area Calculation

  • Painting area is calculated by multiplying the carpet area by 3.5
  • Carpet area is calculated by multiplying the length and breadth of the area

Distemper

  • Distemper is used to hold the paint
  • Coverage area is 50-60 sq.meter

Wood Furniture Painting Process

  • Sanding/cleaning with Paper 600
  • Applying wood putty
  • Applying two coats of paint

Metal Cleaning Process

  • Surface cleaning with Paper 60
  • Applying KPF (Knieting paste filler)
  • Applying red oxide primer (1 coat)
  • Applying two coats of topcoat paint

Water Proofing

  • 0-3% moisture: no waterproofing required
  • 4-11% moisture: 2K Damp proofing, coverage area is 40-50 sq.feet
  • 11-20% moisture: Hydro lock, coverage area is 40-50 sq.feet per liter
  • 20-40% moisture: Hydro lock or 2K Damp lock
  • Above 40% moisture: clean the roof until the brick comes out, then apply 2K Damp proof or Hydro lock

Waterproofing Primers

  • Dampshed interior (DSI) primer
  • Dampshed exterior (DSE) primer

Waterproofing Process

  • Clean the roof using a wire brush and pressure water
  • Repair cracks: if 5-10mm, use repair material; if more than 10mm, use cement
  • Apply Damp proof (1 coat) as a primer coat with diluted 3:1
  • Finally, apply 2 coats of Damp proof

This quiz covers the steps involved in painting and coating processes, including preparation, application, and finishing techniques. It also touches on various types of paints and their uses.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Use Quizgecko on...
Browser
Browser