19 Questions
1 Views
3.7 Stars

Oil and Gas Production and Operations Quiz

Test your knowledge of oil and gas production and operations with this quiz. Explore topics such as workovers, secondary recovery, well abandonment, offshore platform removal, surface facilities, water de-oiling, oil degassing, production profiles, horizontal and multilateral wells, and artificial lift systems.

Created by
@HotScholarship
1/19
Find out if you were right!
Create an account to continue playing and access all the benefits such as generating your own quizzes, flashcards and much more!
Quiz Team

Access to a Library of 520,000+ Quizzes & Flashcards

Explore diverse subjects like math, history, science, literature and more in our expanding catalog.

Questions and Answers

What type of platform is installed with surface facilities for oilfield production?

Fixed platform

What is the purpose of a Field Development Plan?

To specify the engineering, operational, and economical aspects of the project

What is the cumulative cash flow during the field life cycle?

$500 million

What is a reason for performing workovers on a well?

<p>Unsatisfactory performance</p> Signup and view all the answers

What is the primary goal of secondary recovery in oil production?

<p>To extend the life of the reservoir by pushing remaining oil towards production wells</p> Signup and view all the answers

What is the main objective during well abandonment in oil production?

<p>To isolate hydrocarbon-bearing intervals to prevent aquifer contamination</p> Signup and view all the answers

What is the equation for the steady-state flow rate up a well?

<p>$q_o = PI(P_R - P_{wf})$</p> Signup and view all the answers

What is the purpose of gas compression in oil and gas production?

<p>To transport gas to the desired pressure before it is used or exported for sale</p> Signup and view all the answers

What is the main function of Logging While Drilling (LWD) in oil production?

<p>To provide real-time information about the formation while drilling</p> Signup and view all the answers

What is the primary goal of secondary recovery in oil and gas production?

<p>To change the flow paths in the reservoir</p> Signup and view all the answers

What is the main purpose of well abandonment in offshore installations?

<p>To decommission offshore installations</p> Signup and view all the answers

What is the purpose of oil dehydration in oil and gas production?

<p>To remove water from crude oil to meet required standards</p> Signup and view all the answers

What is the function of gas compression in oil and gas production?

<p>To increase the pressure of the gas before use or transport</p> Signup and view all the answers

What is the purpose of well testing in oil and gas production?

<p>To determine the initial well flow rate for production planning and reservoir management</p> Signup and view all the answers

What is the primary goal of secondary recovery in oil production?

<p>To increase the reservoir's energy</p> Signup and view all the answers

What is the main purpose of well abandonment in oil and gas production?

<p>To permanently seal and isolate hydrocarbon-bearing intervals to prevent leakage or contamination</p> Signup and view all the answers

What is the process of removing the volatile components from the oil to ensure it remains in liquid form?

<p>Oil degassing</p> Signup and view all the answers

What are the key features of lower completions in well completions?

<p>Liners, packers, and cemented and perforated completions</p> Signup and view all the answers

What do artificial lift systems in oil and gas production provide?

<p>A mechanical means of pushing or pulling fluids to the surface, and lower the density of hydrocarbon to help it rise</p> Signup and view all the answers

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Study Notes

Oil and Gas Production and Operations

  • Workovers are performed to address unsatisfactory performance of a well, such as restimulating or re-perforating.
  • The primary goal of secondary recovery in oil production is to increase the reservoir's energy, typically through methods such as water or gas injection.
  • The main purpose of well abandonment is to permanently seal and isolate hydrocarbon-bearing intervals to prevent any leakage or contamination.
  • The world's largest ship capable of removing offshore platforms in a single lift is called Pioneering Spirit.
  • Surface facilities in oil and gas production are used to separate, treat, and export the fluids from the wells, including oil, gas, water, and undesirable materials.
  • Water de-oiling is the process of removing oil from the separated water, as the oil may exceed the permitted proportions for disposal.
  • Oil degassing is the process of removing the volatile components from the oil to ensure it remains in liquid form.
  • A typical oilfield production profile includes a peak production period followed by decline and possibly rejuvenation, and ultimately abandonment when operating costs exceed production profit.
  • Horizontal wells have the advantages of longer reservoir sections, higher production indices, the ability to connect laterally discontinuous features, and the ability to define the direction of flow.
  • Multilateral wells increase the advantages associated with horizontal wells and are more popular in Russia and the Middle East.
  • Key features of lower completions in well completions include liners, packers, and cemented and perforated completions.
  • There are two basic types of artificial lift systems: pumps and gas lift, which provide a mechanical means of pushing or pulling fluids to the surface, and lower the density of hydrocarbon to help it rise, respectively.

Trusted by students at

More Quizzes Like This

Well Completion
3 questions

Well Completion

FashionableSunstone avatar
FashionableSunstone
Oil and Gas Production X-mas Tree Equipment
16 questions
Use Quizgecko on...
Browser
Browser