OH&S Procedures and Risk Control Measures

CleverChocolate avatar
CleverChocolate
·
·
Download

Start Quiz

Study Flashcards

10 Questions

Who is responsible for formulating the onsite emergency plan?

Workers' management

What is the purpose of introducing safety measures, quality control, and reliability analysis in system design?

To reduce the probability of failure and improve reliability

What is the key feature of a good offsite emergency plan?

Flexibility in its application to emergencies

What is the purpose of conducting risk evaluation and assessment?

To identify and mitigate potential risks in system design

What is the purpose of the factor of safety in system design?

To improve the reliability of system design and reduce the probability of accidents

What is the main goal of risk control measures in an industrial setting?

To minimize risk factors to an acceptable level

What is a risk in the context of health and safety?

A likelihood of an undesired event occurring within a specified period or under specified circumstances

What is the first step in the study of risk?

Risk analysis

What is a challenge in conducting risk analysis?

The difficulty in getting or generating information about failure probability

Which workers are at a higher risk in industrial premises?

Workers directly exposed to coal handling areas

Learn about the measures taken to ensure individual safety in industrial premises, including risk assessment and hazard analysis. Understand how to identify and mitigate risks to prevent accidents and injuries.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free
Use Quizgecko on...
Browser
Browser