According to the code, which of the following statements is true about capping outlets?

  • Capping outlets is only required for certain types of appliances.
  • All outlets, including valves, must be capped immediately after installation. (correct)
  • Outlets do not need to be capped if they are connected to an appliance.
  • Outlets only need to be capped if they will not be used for an extended period.
  • What is the exception for laboratory appliances regarding capping outlets?

  • There is no exception for laboratory appliances regarding capping outlets.
  • Laboratory appliances require special explosion-proof caps.
  • Laboratory appliances must have double-capped outlets.
  • Laboratory appliances do not require capped outlets. (correct)
  • Which of the following is permitted as an alternative to capping outlets?

  • Capping the outlet with a non-threaded cap.
  • Leaving the outlet uncapped if it will be used within a week.
  • Using a standard ball valve to cap the outlet.
  • Using a listed quick-disconnect device with integral shutoff. (correct)
  • What is required for appliance shutoff valves installed in fireplaces used for solid fuel burning?

    <p>They must be removed and the piping capped gastight.</p> Signup and view all the answers

    Where must an accessible gas shutoff valve be provided according to the code?

    <p>Upstream of each gas pressure regulator.</p> Signup and view all the answers

    What requirement is given for main gas shutoff valves controlling multiple gas piping systems?

    <p>They must be readily accessible for operation and protected from physical damage.</p> Signup and view all the answers

    What is required for gas piping systems to be readily identified?

    <p>They shall be marked with a metal tag or other permanent means attached by the installing agency.</p> Signup and view all the answers

    In multiple-tenant buildings supplied through a master meter or without readily accessible meters/regulators, what is required?

    <p>An individual shutoff valve for each apartment or tenant line at a generally accessible point.</p> Signup and view all the answers

    What is required for each building in a common gas system serving multiple buildings?

    <p>Shutoff valves installed at each building.</p> Signup and view all the answers

    How should emergency shutoff valves be identified?

    <p>They should be plainly marked as such and their locations posted as required by the authority having jurisdiction.</p> Signup and view all the answers

    What is required for laboratory spaces containing multiple gas outlets?

    <p>A single shutoff valve through which all gas outlets are supplied, located within or adjacent to the laboratory.</p> Signup and view all the answers

    What is prohibited within the interior of gas piping or fittings?

    <p>Devices that reduce the cross-sectional area or obstruct the free flow of gas, unless accounted for in the system design.</p> Signup and view all the answers

    More Like This