Podcast
Questions and Answers
Report installation of equal component vice specified component including: Physical dimensions, bolting pattern, __________, size, location, and type of miscellaneous service connections.
Report installation of equal component vice specified component including: Physical dimensions, bolting pattern, __________, size, location, and type of miscellaneous service connections.
power requirements
Recovery and turn-in of ozone depleting substance includes recycling chlorofluorocarbons back into the specific system's equipment.
Recovery and turn-in of ozone depleting substance includes recycling chlorofluorocarbons back into the specific system's equipment.
False
What is required for the Contractor Furnished Anode Purchase and Inspection?
What is required for the Contractor Furnished Anode Purchase and Inspection?
What is the purpose of the Emergency Planning and Community Right-to-Know Act (EPCRA)?
What is the purpose of the Emergency Planning and Community Right-to-Know Act (EPCRA)?
Signup and view all the answers
What must be provided in the Ship's Stability maintenance procedures?
What must be provided in the Ship's Stability maintenance procedures?
Signup and view all the answers
What should be included in the procedure for Mechanically Attached Fitting (MAF)?
What should be included in the procedure for Mechanically Attached Fitting (MAF)?
Signup and view all the answers
Which of the following services must be provided for the Government Sponsored Planning Yard/CDM On-Site Representative Facility?
Which of the following services must be provided for the Government Sponsored Planning Yard/CDM On-Site Representative Facility?
Signup and view all the answers
Which has to be accomplished in relation to chemical disinfection procedures?
Which has to be accomplished in relation to chemical disinfection procedures?
Signup and view all the answers
What is required for bolting patterns during installation?
What is required for bolting patterns during installation?
Signup and view all the answers
What does 009-01 signify?
What does 009-01 signify?
Signup and view all the answers
What is the definition of 009-02?
What is the definition of 009-02?
Signup and view all the answers
What does 009-03 refer to?
What does 009-03 refer to?
Signup and view all the answers
What is the requirement for 009-05?
What is the requirement for 009-05?
Signup and view all the answers
What does 009-09 provide?
What does 009-09 provide?
Signup and view all the answers
What does 009-10 control?
What does 009-10 control?
Signup and view all the answers
What should be ensured under 009-11?
What should be ensured under 009-11?
Signup and view all the answers
What does 009-12 involve?
What does 009-12 involve?
Signup and view all the answers
What is the task for 009-15?
What is the task for 009-15?
Signup and view all the answers
What do the guidelines in 009-19 relate to?
What do the guidelines in 009-19 relate to?
Signup and view all the answers
What do you need to maintain per 009-20?
What do you need to maintain per 009-20?
Signup and view all the answers
What is required by 009-25?
What is required by 009-25?
Signup and view all the answers
What does 009-38 encompass?
What does 009-38 encompass?
Signup and view all the answers
What is the focus of 009-61?
What is the focus of 009-61?
Signup and view all the answers
What is the task defined in 009-73?
What is the task defined in 009-73?
Signup and view all the answers
What does 009-80 aim to maintain?
What does 009-80 aim to maintain?
Signup and view all the answers
What does 009-81 require?
What does 009-81 require?
Signup and view all the answers
Study Notes
General Criteria and Compliance
- 009-01: Establishes general notes and requirements for reports, delays, tests, checkouts, deviations, document submissions, security, safety data sheets, and error corrections.
- 009-02: Pertains to the Environmental Compliance Report for material usage, focusing on environmental safety, paint waste procedures, and mandatory reporting for hazardous waste.
Hazardous Substance Control
- 009-03: Emphasizes exposure monitoring and compliance for toxic and hazardous substances, including necessary protective measures like respiratory protection and medical surveillance.
Access and Protection Standards
- 009-05: Outlines procedures for temporary access cuts, requiring proper announcement, measurement, protection, and adherence to NAVSEA standards.
- 009-06: Addresses maintaining protection from contaminants in non-radioactive operations by sealing all equipment and openings.
Process Control and Material Management
- 009-09: Describes the Process Control Procedure (PCP) necessary for detailing contractor information, compliance, and work descriptions.
- 009-19: Mandates Provisioning Technical Documentation (PTD) for new or modified components, including a Provisioning Parts List and Engineering Data for Provisioning.
Safety and Environmental Compliance
- 009-10: Focuses on the safe handling and monitoring of Asbestos-Containing Materials (ACM), including inspection protocols and necessary protective measures.
- 009-61: Addresses safe practices for working with fluorocarbons and emphasizes inspections by marine chemists.
Inspections and Maintenance Procedures
- 009-11: Involves the installation of insulation and lagging according to military standards.
- 009-30: Outlines inspection procedures for boiler sample tubes, emphasizing the identification of soft and hard deposits.
Repair and Testing Standards for Equipment
- 009-12: Covers welding and inspection standards, ensuring compliance with military requirements for welders and brazers.
- 009-45 to 009-55: Details repair procedures for various valves, including disassembly, cleaning, testing, and ensuring proper seat tightness.
Compartment and Facility Management
- 009-80: Requires the maintenance of ship facilities to remain operational and habitable.
- 009-81: Focuses on the complete compartment closeout process, ensuring all tasks are finalized in coordination with supervisors.
Environmental and Safety Protocols
- 009-86: Stipulates the recovery and turn-in processes for ozone-depleting substances, stressing the importance of proper handling and recycling.
- 009-87: Involves chemical disinfection procedures for potable water systems, including testing for chlorine residuals.
Miscellaneous
- 009-70: Discusses the requirement for a written heavy weather/mooring plan to mitigate damage during severe weather conditions.
- 009-84: Mandates replacement of non-NAVSEA safety standard fasteners with approved fasteners, ensuring compliance with specifications.### Certification and Inspection Processes
- Certify entry into restricted areas ensuring safety protocols for workers and hot work requirements are met.
- Follow guidelines in sections 2.2 through 2.6 for inspections related to Collection, Holding and Transfer (CHT) and MOGAS tanks.
- Inspect and certify adjacent tanks, spaces, or piping as needed throughout the Job Order execution to ensure compliance and safety in case of emergencies.
Contractor Furnished Anode
- Conduct visual inspection of each anode for compliance with standards.
- Anodes must display: MILSPEC revision letter, manufacturer name or logo, and heat or melt number.
Technical Representative Responsibilities
- Ensure the presence of a qualified on-site Technical Representative.
- Assist with processes such as NAVSEA pilot coating system application, repair, and equipment testing.
Propeller Inspection Protocols
- Conduct visual inspections focusing on blade alignment and edge protection removal.
Resilient Mount Installation
- Inspect the foundation of equipment for structural soundness.
- Check for deterioration, pitting, cracks, and damage; clean and paint any affected surfaces.
Environmental Compliance Regulations
- Adhere to the Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) mandates.
- Notify entities regarding any hazardous substance releases.
Mechanically Attached Fitting (MAF) Procedures
- Provide procedure documentation detailing quality control, inspection, and safety requirements prior to MAF installation.
- Include responsibilities and a training program to ensure proper installation practices.
Ball Valve Repair Process
- Disassemble and inspect ball valves, ensuring clean condition and alignment.
- Conduct hydrostatic tests and confirm seat tightness during repairs.
Ship Departure Reporting
- Deliver an accurate Ship Departure Report, ensuring all details are correctly provided.
Maintenance of Ship Stability
- Perform engineering calculations to maintain ship stability during modifications, repairs, and fluid management.
- Address stability discrepancies over 2 degrees within 4 hours of detection to uphold safety standards.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
This set of flashcards is focused on the NAVSEA Standard Items for FY-20. Each card provides definitions and general criteria for various compliance and safety requirements relevant to naval operations. It serves as a quick reference for professionals involved in environmental compliance and safety protocols.