MP in ACUVUE OASYS Production
17 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What MP applies to Tam 4 while producing ACUVUE OASYS?

  • MP-0142 (correct)
  • MP 3
  • MP 5
  • MP 6
  • What is the purpose of identifying Z8 Enclosure Door below carton hopper with Temporary Safety Warning Placard?

  • To mark the location for emergency exit in case of an accident
  • To highlight the need for regular maintenance of the carton hopper
  • To indicate the presence of hazardous materials inside the enclosure (correct)
  • To remind employees to keep the door closed during operation
  • What is the significance of identifying Safety devices in the context of SHM?

  • To ensure compliance with environmental regulations
  • To optimize the use of solvents and monomers
  • To prevent accidents and ensure employee safety (correct)
  • To track the movement of pallets under the Inlay plate
  • Why are pallets lifted under Inlay plate and where are alignment pins located under Inlay Stripper Plate?

    <p>To prevent shingles when the robot arm pulls away</p> Signup and view all the answers

    When is chamber and bottom blow used in precure?

    <p>To adjust the temperature around precure setpoint</p> Signup and view all the answers

    What is the focus of Audits, Checks, and Inspections mentioned in EGOP-0017?

    <p>Identifying tasks related to Audits, Checks, and Inspections</p> Signup and view all the answers

    What does MP-0142 refer to in the context of Tam 4 producing ACUVUE OASYS?

    <p>A specific manufacturing process for ACUVUE OASYS</p> Signup and view all the answers

    What is the purpose of the parameter edit screen 4 for Heat Seal Compliant Head?

    <p>To modify the heat seal die function</p> Signup and view all the answers

    What is the function of the 03IG-0501 Heat Seal Die stripper plate?

    <p>To remove excess material from the die</p> Signup and view all the answers

    How does the machine identify arrays left behind in sterilizer tray in Zone 6?

    <p>By visual inspection</p> Signup and view all the answers

    What is the purpose of saline buffer initialize function?

    <p>To reset the machine tracking system</p> Signup and view all the answers

    What are the Nestal IMM Cycle Stop Procedures?

    <p>Press Manual Mode button and then Cycle Stop button</p> Signup and view all the answers

    What is the benchmark distance for IR heads?

    <p>$35$ mm</p> Signup and view all the answers

    What function do the hex pumps in tower 2 serve?

    <p>Maintaining mold temperature</p> Signup and view all the answers

    How do you reset the Mitsubishi Robot in Zone 1?

    <p>Reset PLC0</p> Signup and view all the answers

    What are the Reset Procedures for the Nestal IMM?

    <p>Press Manual Mode button to take machine out of Automatic mode. Press Reset button to reset fault. Correct fault. Restart per Cycle Start Procedures.</p> Signup and view all the answers

    What are the Purging Procedures for the Nestal IMM?

    <p>Verify mold and barrel heat temperatures are within range, purge barrel if necessary.</p> Signup and view all the answers

    Study Notes

    Tam 4 Producing ACUVEE OASYS

    • MP applies when producing ACUVEE OASYS
    • MP-0142 refers to Tam 4 producing ACUVEE OASYS

    Safety Features

    • Z8 Enclosure Door is identified with a Temporary Safety Warning Placard
    • Safety devices are significant in the context of SHM

    Machine Functionality

    • Pallets are lifted under the Inlay plate, and alignment pins are located under the Inlay Stripper Plate
    • Chamber and bottom blow are used in precure
    • The parameter edit screen 4 is for Heat Seal Compliant Head
    • The 03IG-0501 Heat Seal Die stripper plate serves a specific function
    • The machine identifies arrays left behind in the sterilizer tray in Zone 6
    • Saline buffer initialize function serves a specific purpose

    Audits and Inspections

    • Audits, Checks, and Inspections are focused on, as mentioned in EGOP-0017

    Nestal IMM

    • Nestal IMM Cycle Stop Procedures are specific
    • Purging Procedures for the Nestal IMM exist
    • Reset Procedures for the Nestal IMM exist

    Other

    • Hex pumps in Tower 2 serve a specific function
    • The benchmark distance for IR heads is specific
    • Mitsubishi Robot in Zone 1 can be reset following a specific procedure

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on the manufacturing process of ACUVUE OASYS by identifying the specific Manufacturing Practice (MP) that applies or doesn't apply to Tam 4 during production.

    More Like This

    Use Quizgecko on...
    Browser
    Browser