Which of the following activities is not permitted within the Eco-sensitive Zone?
Which of the following activities is not permitted within the Eco-sensitive Zone?
- Tourism activities aligned with a Tourism Master Plan
- Quarrying (correct)
- Non-polluting small-scale industries
- Mining (correct)
What is the role of the Monitoring Committee regarding quarrying activities?
What is the role of the Monitoring Committee regarding quarrying activities?
- To oversee the development of a new Tourism Master Plan.
- To grant permission for new mining leases.
- To ensure that all quarrying activities are environmentally sustainable.
- To decide on special permissions for limited quarrying for local needs. (correct)
What is not a requirement for the proposed Tourism Master Plan?
What is not a requirement for the proposed Tourism Master Plan?
- Approval from the Ministry of Environment and Forests.
- Development of plans for the conservation of natural heritage. (correct)
- Input from the Ministry of Tourism.
- Emphasis on eco-tourism, eco-education, and eco-development.
What is the timeframe for developing conservation plans for man-made heritage?
What is the timeframe for developing conservation plans for man-made heritage?
Which of the following areas is not a site of valuable natural heritage, as identified in the document?
Which of the following areas is not a site of valuable natural heritage, as identified in the document?
What is the primary purpose of the Sub-zonal Master Plans?
What is the primary purpose of the Sub-zonal Master Plans?
What is the requirement for Habitations within the Eco-sensitive Zone with a population exceeding 5000?
What is the requirement for Habitations within the Eco-sensitive Zone with a population exceeding 5000?
Which type of industry is specifically permitted within the Eco-sensitive Zone?
Which type of industry is specifically permitted within the Eco-sensitive Zone?
What is not required before felling trees in the Eco-sensitive Zone?
What is not required before felling trees in the Eco-sensitive Zone?
What is the effect of not having approved Zonal and Sub-zonal Master Plans for the Eco-sensitive Zone?
What is the effect of not having approved Zonal and Sub-zonal Master Plans for the Eco-sensitive Zone?
Flashcards
Eco-sensitive Zone
Eco-sensitive Zone
An area requiring special regulations to protect its environment.
Zonal Master Plan
Zonal Master Plan
A comprehensive plan guiding the development of specific zones, requiring governmental approval.
Sub-zonal Master Plans
Sub-zonal Master Plans
Detailed plans for specific sub-areas within the broader Zonal Master Plan.
Area Development Plan
Area Development Plan
Signup and view all the flashcards
Tree Preservation Rules
Tree Preservation Rules
Signup and view all the flashcards
Tourism Master Plan
Tourism Master Plan
Signup and view all the flashcards
Non-polluting Industries
Non-polluting Industries
Signup and view all the flashcards
Mining Ban
Mining Ban
Signup and view all the flashcards
Natural Heritage Sites
Natural Heritage Sites
Signup and view all the flashcards
Man-made Heritage
Man-made Heritage
Signup and view all the flashcards
Study Notes
Matheran Municipal Council Area Plan
- Separate sub-zonal master plans will be created for areas within and outside the Matheran Municipal Council.
- These plans will be a part of a zonal master plan, approved by the Ministry of Environment and Forests.
- Habitats with a population exceeding 5000 within the Eco-sensitive Zone must also have area development plans.
- These plans should include regulations for gaothan and gaothan expansion.
Eco-Sensitive Zone Development Regulations
- No increase in existing parameters like floor area ratio, maximum number of storeys, and ground coverage are allowed, pending approval of the zonal master plan.
- No new constructions are allowed unless for repairs or restorations, and should not alter the original structure or plinth area.
- Specific industrial and service units with limited pollution, and non-hazardous, will be permitted.
- Quarrying activities will be prohibited in the Eco-sensitive zone, however, small-scale quarrying for construction will be permitted with authorization.
Natural Heritage
- The locations of natural heritage such as rock formations, waterfalls, etc. within the Eco-sensitive zones should be identified and plans for their preservation created.
- These plans are to be included in the zonal and sub-zonal master plans.
Man-made Heritage
- Buildings, structures, artefacts, areas with historical significance in the Eco-sensitive Zone, should be identified.
- Plans for conservation of these items, both exteriors and relevant interiors, will be included in the zonal and sub-zonal master plans.
Tree Regulations
- No trees, whether on government, revenue, or private land, can be cut without permission from the appropriate governing body (state government or collector.)
- The amount of allowable slope for trees is 20 degrees or more.
Quarrying and Mining
- Quarrying and mining activities are prohibited in the Eco-Sensitive Zone unless the permission is granted by the Monitoring Committee for limited use /construction.
Tourism
- Tourism activities should follow the guidelines in the Tourism Master Plan.
- Emphasis should be placed on eco-tourism, eco-learning, and development.
- Plans are to be created by the State Department of Tourism, agreed with the Ministry of Tourism of India and approved by the Ministry of Environment and Forests.