25 Questions
Which software is used to troubleshoot and see if a specific choke is on a PID loop?
Cygnet
What does PID stand for?
Proportional Integral Derivative
When should a Maximo Ticket be created?
When data from other software proves inconclusive
What is the purpose of comparing data and timing?
To identify wells that have reached their decline point
What is the role of a PCC Technician in the troubleshooting process?
To engage the engineer on Salesforce
Which report tab can be used to identify wells that are not flowing on rate according to the last Cygnet poll?
Gas Rate vs Flat Time Tracker
What is the other name for Normalized [Flat Time] Rate in Cygnet?
Optimized Rate
Which Salesforce report tab provides a list of all Wedge and Base Production wells currently on surveillance for monitoring flat time?
Surveillance Object
What does the Deviation from Target Rates report tab provide insights into?
Forecast target deviation
Which report tab can be used to identify chokes that need to be adjusted to maintain Flat Time Target Rates?
Choke %
Which report tab can be used to track Normalized [Flat Time] Rates?
Flat Time Tracker
What is the purpose of the Gas Rate vs Flat Time tracker?
To track Normalized [Flat Time] Rates
What does the Deviation from Target Rates report tab provide insights into?
How far off from forecast target the well is
Which report tab is a useful tool to identify chokes that need to be adjusted to maintain Flat Time Target Rates?
Choke % report tab
What is the purpose of the Flat Time Target Surveillance?
To communicate with a production engineer
What is the role of the Flat Time Well Tracker?
To troubleshoot data
What is the other name for Normalized [Flat Time] Rate in Cygnet?
Optimized Rate
Which software is used to troubleshoot and see if a specific choke is on a PID loop?
Cygnet
What is the purpose of comparing data and timing?
To identify wells that have reached their decline point
When should a Maximo Ticket be created?
When data from other software proves inconclusive
What is the role of a PCC Technician in the troubleshooting process?
To troubleshoot and perform firsthand troubleshooting
Which report tab can be used to identify wells that are not flowing on rate according to the last Cygnet poll?
Deviation from Target Rates
What does the Deviation from Target Rates report tab provide insights into?
Wells not flowing on rate
Which report tab can be used to identify chokes that need to be adjusted to maintain Flat Time Target Rates?
Flat Time Well list and Surveillance
What is the other name for Normalized [Flat Time] Rate in Cygnet?
Maximo Ticket
Test your knowledge on Normalized Flat Time Rate and its importance in Cygnet production operations. Learn how to track and optimize wedge production using the Flat Time Tracker tool.
Make Your Own Quizzes and Flashcards
Convert your notes into interactive study material.
Get started for free