5 Questions
The heat switch next to the main power supply needs to be turned on first?
True
The glue heating switch on the control panel needs to be set to 75°C?
True
The glue stirring/mixer switch should be turned on when the temperature reaches 75°C?
True
The water outlet control switch needs to be turned on to fill the roller with water?
True
The viscosity value on the viscosity controller should be set to 190(CN) 240 (PH)?
True
Test your knowledge on the correct steps to activate the heat switch, glue heating switch, glue stirring switch, and water outlet control switch on a positioning machine. Enhance your understanding of temperature settings and water filling procedures with this informative quiz.
Make Your Own Quizzes and Flashcards
Convert your notes into interactive study material.
Get started for free