Mastering CPM and PERT
5 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which of the following is a benefit of CPM?

  • It is mathematically complex
  • It gives critical path and slack time (correct)
  • It does not provide critical path and slack time
  • It is not useful in monitoring costs
  • Which of the following is a limitation of CPM?

  • It does not require clearly defined activities
  • It overemphasizes critical paths (correct)
  • It is not mathematically simple
  • It does not consider precedence relationships
  • Which assumption is PERT based on?

  • Activities have fixed durations
  • Activities have no dependencies
  • Activities have equal probabilities
  • Activities have uncertain durations (correct)
  • What are the three time estimates required in PERT?

    <p>Optimistic time, pessimistic time, and expected time</p> Signup and view all the answers

    What does the expected time in PERT represent?

    <p>The time required to accomplish a task</p> Signup and view all the answers