Master Polymer Chemistry
3 Questions
2 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the working time of the mixture in dough-like stage?

  • More than 15 minutes
  • At least 10 minutes
  • At least 5 minutes (correct)
  • Less than 5 minutes
  • How can the working time of the mixture be extended in warm weather?

  • By refrigeration (correct)
  • By heating
  • By adding more polymer
  • By adding more monomer
  • What is dough forming time?

  • The time that the mixture remains in dough-like stage
  • The time that the mixture is heated
  • The time from beginning of mixing of polymer with monomer until reaching the dough-like consistency less than 10 min (correct)
  • The time that the mixture is stored in air tight container
  • Study Notes

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on polymer chemistry with our quiz on dough forming time and working time! This quiz will cover the time it takes for polymer and monomer to form a dough-like consistency, as well as the duration of time that the mixture remains moldable. Learn about how temperature can affect working time and how to extend it with refrigeration. Sharpen your understanding of polymer chemistry terminology and concepts with this quiz!

    More Like This

    Use Quizgecko on...
    Browser
    Browser